DEPLOYDatabase

Data center facility

River Bend AI Data Center Campus

Hut 8 (capacity for Fluidstack) · St. Francisville. Every figure below is individually sourced and dated.


Facility record

announced

Status

crypto hpc

Type

245 MW

Critical IT

2026

Operational

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 245 MW critical IT load (330 MW initial utility capacity from Entergy) (claimed) · source
  • record: River Bend AI Data Center Campus (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: announced

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is River Bend AI Data Center Campus?
River Bend AI Data Center Campus is a data center facility record on the DEPLOY registry, in St. Francisville. Every fact on the record is individually sourced and dated.
Who operates River Bend AI Data Center Campus?
Hut 8 (capacity for Fluidstack) operates River Bend AI Data Center Campus, per the sourced record on the DEPLOY registry.
Is River Bend AI Data Center Campus operating?
River Bend AI Data Center Campus is recorded as announced on the DEPLOY registry, with 245 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on River Bend AI Data Center Campus?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track River Bend AI Data Center Campus on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). River Bend AI Data Center Campus: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/hut8-river-bend-ai-west-feliciana-la

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces