DEPLOYDatabase

Data center facility

Microsoft East Wenatchee Data Center (EAT03)

Microsoft · East Wenatchee. Every figure below is individually sourced and dated.


In clusterDouglas County(9)·Washington(78)

Facility record

operating

Status

hyperscale

Type

Microsoft

Operator

244,440 sqft

Building

2024

Operational

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • building sqft: 244440 (reported) · source
  • record: Microsoft East Wenatchee Data Center (EAT03) (reported) · source
  • status: operating (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Microsoft East Wenatchee Data Center (EAT03)?
Microsoft East Wenatchee Data Center (EAT03) is a data center facility record on the DEPLOY registry, in East Wenatchee. Every fact on the record is individually sourced and dated.
Who operates Microsoft East Wenatchee Data Center (EAT03)?
Microsoft operates Microsoft East Wenatchee Data Center (EAT03), per the sourced record on the DEPLOY registry.
Is Microsoft East Wenatchee Data Center (EAT03) operating?
Microsoft East Wenatchee Data Center (EAT03) is recorded as operating on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Microsoft East Wenatchee Data Center (EAT03)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Microsoft East Wenatchee Data Center (EAT03) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Microsoft East Wenatchee Data Center (EAT03): data center facility record. Retrieved August 24, 2026, from https://registry.deploy.report/datacenters/facilities/microsoft-east-wenatchee-wa-eat03

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces