DEPLOYDatabase

Data center facility

Microsoft Granger Campus (St. Joe Farms)

Microsoft · Granger. Every figure below is individually sourced and dated.


In clusterIndiana(85)

Facility record

planned

Status

hyperscale

Type

Microsoft

Operator

Granger

Location

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • record: Microsoft Granger Campus (St. Joe Farms) (reported) · source
  • status: planned (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Microsoft Granger Campus (St. Joe Farms)?
Microsoft Granger Campus (St. Joe Farms) is a data center facility record on the DEPLOY registry, in Granger. Every fact on the record is individually sourced and dated.
Who operates Microsoft Granger Campus (St. Joe Farms)?
Microsoft operates Microsoft Granger Campus (St. Joe Farms), per the sourced record on the DEPLOY registry.
Is Microsoft Granger Campus (St. Joe Farms) operating?
Microsoft Granger Campus (St. Joe Farms) is recorded as planned on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Microsoft Granger Campus (St. Joe Farms)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Microsoft Granger Campus (St. Joe Farms) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Microsoft Granger Campus (St. Joe Farms): data center facility record. Retrieved August 25, 2026, from https://registry.deploy.report/datacenters/facilities/microsoft-granger-st-joe-farms-in

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces