Data center facility
Bedington Campus (Penzance)
Penzance · Falling Waters. Every figure below is individually sourced and dated.
Facility record
announced
Status
hyperscale
Type
Operator
Location
600 MW
Critical IT
1,900,000 sqft
Building
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Aug 2026Current: announced
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Bedington Campus (Penzance)?
Who operates Bedington Campus (Penzance)?
Is Bedington Campus (Penzance) operating?
How verified is the data on Bedington Campus (Penzance)?
Deploy Watch
Track Bedington Campus (Penzance) on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Bedington Campus (Penzance): data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/penzance-bedington-campus-berkeley-wv
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/penzance-bedington-campus-berkeley-wv.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/penzance-bedington-campus-berkeley-wv
- Data documentation: /data
- Query this programmatically: Deploy MCP