PowerHouse Data Centers (AREP) · Spotsylvania. Every figure below is individually sourced and dated.


Facility record

under construction

Status

hyperscale

Type

Spotsylvania

Location

800 MW

Critical IT

3,500,000 sqft

Building

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • building sqft: 3500000 (claimed) · source
  • critical it mw: 800 (claimed) · source
  • record: PowerHouse 95 (PH 95) Data Center Campus (reported) · source
  • status: under_construction (claimed) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is PowerHouse 95 (PH 95) Data Center Campus?
PowerHouse 95 (PH 95) Data Center Campus is a data center facility record on the DEPLOY registry, in Spotsylvania. Every fact on the record is individually sourced and dated.
Who operates PowerHouse 95 (PH 95) Data Center Campus?
PowerHouse Data Centers (AREP) operates PowerHouse 95 (PH 95) Data Center Campus, per the sourced record on the DEPLOY registry.
Is PowerHouse 95 (PH 95) Data Center Campus operating?
PowerHouse 95 (PH 95) Data Center Campus is recorded as under construction on the DEPLOY registry, with 800 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on PowerHouse 95 (PH 95) Data Center Campus?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track PowerHouse 95 (PH 95) Data Center Campus on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). PowerHouse 95 (PH 95) Data Center Campus: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/powerhouse-95-spotsylvania-county-va

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces