Data center facility

PowerHouse Joliet Technology Center

PowerHouse Data Centers · Joliet. Every figure below is individually sourced and dated.


In clusterIllinois(168)

Facility record

planned

Status

hyperscale

Type

Joliet

Location

1800 MW

Critical IT

3,468,000 sqft

Building

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • building sqft: 3468000 (24 two-story buildings at 144,500 sq ft each on 795 acres) (claimed) · source
  • critical it mw: 1800 (1.8 GW) (claimed) · source
  • record: PowerHouse Joliet Technology Center (reported) · source
  • status: approved by Joliet City Council 8-1 on March 20, 2026 (JV with Hillwood); work to begin early 2027, first six-building sub-campus by 2028, full build-out 2032 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is PowerHouse Joliet Technology Center?
PowerHouse Joliet Technology Center is a data center facility record on the DEPLOY registry, in Joliet. Every fact on the record is individually sourced and dated.
Who operates PowerHouse Joliet Technology Center?
PowerHouse Data Centers operates PowerHouse Joliet Technology Center, per the sourced record on the DEPLOY registry.
Is PowerHouse Joliet Technology Center operating?
PowerHouse Joliet Technology Center is recorded as planned on the DEPLOY registry, with 1800 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on PowerHouse Joliet Technology Center?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track PowerHouse Joliet Technology Center on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). PowerHouse Joliet Technology Center: data center facility record. Retrieved August 23, 2026, from https://registry.deploy.report/datacenters/facilities/powerhouse-joliet-technology-center-will-il

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces