DEPLOYDatabase

Data center facility

Switch Grand Rapids (Pyramid Campus)

Switch · Grand Rapids. Every figure below is individually sourced and dated.


Facility record

operating

Status

colocation

Type

Switch

Operator

On the map

Placed at its city centroid. See it among every tracked data center on the national map.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • power capacity mw: Up to 237 MW upon completion (reported) · source
  • record: Switch Grand Rapids (Pyramid Campus) (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Switch Grand Rapids (Pyramid Campus)?
Switch Grand Rapids (Pyramid Campus) is a data center facility record on the DEPLOY registry, in Grand Rapids. Every fact on the record is individually sourced and dated.
Who operates Switch Grand Rapids (Pyramid Campus)?
Switch operates Switch Grand Rapids (Pyramid Campus), per the sourced record on the DEPLOY registry.
Is Switch Grand Rapids (Pyramid Campus) operating?
Switch Grand Rapids (Pyramid Campus) is recorded as operating on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Switch Grand Rapids (Pyramid Campus)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Switch Grand Rapids (Pyramid Campus) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.