DEPLOYDatabase

Data center facility

Vantage Ashburn I (VA1)

Vantage Data Centers · Sterling · 45200 Vantage Data Plaza, Sterling, VA 20166. Every figure below is individually sourced and dated.


In clusterLoudoun County(62)·Virginia(337)

Facility record

operating

Status

hyperscale

Type

Sterling

Location

206 MW

Critical IT

1,700,000 sqft

Building

On the data center map

Free to use on your site, with a link back to DEPLOY.

Construction evidence

Dated satellite imagery of the site itself, oldest to newest. This is what the campus looks like from orbit over time, not a status we recorded: bare land, grading, and building mass tell their own story. Sentinel-2 true color, 10 m resolution, cloud-free scenes; it shows site-scale change, not fine detail. Click any frame to expand it.

2018-05-24Contains modified Copernicus Sentinel data 2018
2020-09-15Contains modified Copernicus Sentinel data 2020
2022-08-13Contains modified Copernicus Sentinel data 2022
2024-09-09Contains modified Copernicus Sentinel data 2024
2025-06-03Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. How we source and verify it: satellite construction evidence.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • building sqft: 1700000 (claimed) · source
  • critical it mw: 206 (claimed) · source
  • record: Vantage Ashburn I (VA1) (reported) · source
  • status: operating (reported) · source
  • streetAddress: 45200 Vantage Data Plaza, Sterling, VA 20166 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Vantage Ashburn I (VA1)?
Vantage Ashburn I (VA1) is a data center facility record on the DEPLOY registry, in Sterling. Every fact on the record is individually sourced and dated.
Who operates Vantage Ashburn I (VA1)?
Vantage Data Centers operates Vantage Ashburn I (VA1), per the sourced record on the DEPLOY registry.
Is Vantage Ashburn I (VA1) operating?
Vantage Ashburn I (VA1) is recorded as operating on the DEPLOY registry, with 206 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Vantage Ashburn I (VA1)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Vantage Ashburn I (VA1) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Vantage Ashburn I (VA1): data center facility record. Retrieved August 23, 2026, from https://registry.deploy.report/datacenters/facilities/vantage-ashburn-i-sterling-virginia

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces