DEPLOYDatabase

Data center facility

Yondr Loudoun County DC2 (96MW campus)

Yondr Group · Sterling. Every figure below is individually sourced and dated.


Facility record

under construction

Status

hyperscale

Type

Yondr Group

Operator

Sterling

Location

96 MW

Critical IT

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 96 (reported) · source
  • record: Yondr Loudoun County DC2 (96MW campus) (reported) · source
  • status: under_construction (first 12MW phase RFS) (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Yondr Loudoun County DC2 (96MW campus)?
Yondr Loudoun County DC2 (96MW campus) is a data center facility record on the DEPLOY registry, in Sterling. Every fact on the record is individually sourced and dated.
Who operates Yondr Loudoun County DC2 (96MW campus)?
Yondr Group operates Yondr Loudoun County DC2 (96MW campus), per the sourced record on the DEPLOY registry.
Is Yondr Loudoun County DC2 (96MW campus) operating?
Yondr Loudoun County DC2 (96MW campus) is recorded as under construction on the DEPLOY registry, with 96 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Yondr Loudoun County DC2 (96MW campus)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Yondr Loudoun County DC2 (96MW campus) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Yondr Loudoun County DC2 (96MW campus): data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/yondr-loudoun-county-dc2-va

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces