Data center campus
Highreso Shika Town GPU Data Center (Ishikawa)
Highreso Shika Town GPU Data Center is a tracked AI data center campus in Shika Town, Ishikawa, Japan. Highreso's GPU-dedicated data center in the Noto Core Industrial Park, Shika Town: DC1 opened Aug 2019 and DC2 (reported as Japan's largest GPU-dedicated DC, ~1,107 sqm) opened Aug 2022, hosting the GPUSOROBAN cloud on N
Energized · Highreso · Hokuriku Electric Power Company · Shika Town, Ishikawa, Japan
Capacity: announced vs energized
| Source |
|---|
Key facts
Lifecycle
Energized
Developer
Location
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- DC2 opening (company-claimed, Aug 2022)
- Opened Aug 29 2022; called Japan's largest GPU-dedicated data center then; NVIDIA A100s for GPUSOROBAN.
- DC1
- GPU-dedicated data center in Shika Town operating since 2019
- Renewable power (company-claimed)
- Hokuriku Electric's Kagayaki GREEN RE100 supplies 10% of facility power.
- Cooling (company-claimed)
- Outside-air cooling cuts cooling power about 90%; DC1 PUE under 1.1.
- Power design (reported, Sep 2022)
- DC2 runs on utility power only, without UPS or emergency generators, suited to restartable GPU jobs.
On the data center map
Every tracked data center is on this map, centered on Highreso Shika Town GPU Data Center. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
The deal
- operator
- Highreso · Operates the GPUSOROBAN GPU cloud from this campus.
- grid operator
- Hokuriku Electric Power Company · Utility; Kagayaki GREEN RE100 renewable supply for DC2.
- chip supplier
- NVIDIA · A100 (80GB) and RTX A4000.
Why here
Highreso Shika Town GPU Data Center is in Shika Town, Ishikawa, Japan. It connects to the Hokuriku Electric Power Company grid. This siting summary is composed from the record's held fields, not speculation; see methodology.
Timeline
- Aug 2026party addedchip_supplier: NVIDIA
- Oct 2026Current: Energized
Sources
- Highreso opens second data center in Shika Town, Ishikawa (RE100) · Highreso
- Highreso opens Japan's largest-scale GPU-dedicated second data center in Shika Town · PR TIMES
- 石川県志賀町に第2データセンターを開設し、再エネ電気「かがやきGREEN RE100」を導入しました
- HIGHRESO - Japan's GPU Cloud for Global AI Innovation
- GPUクラウドのハイレゾ、志賀町第2データセンター開所式・内覧会を実施
4fa8da68-e05f-4970-9d3e-641c00b15390 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is Highreso Shika Town GPU Data Center (Ishikawa)?
Who is building Highreso Shika Town GPU Data Center (Ishikawa)?
Is Highreso Shika Town GPU Data Center (Ishikawa) operating yet?
How verified is the data on Highreso Shika Town GPU Data Center (Ishikawa)?
Deploy Watch
Track Highreso Shika Town GPU Data Center (Ishikawa) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Highreso Shika Town GPU Data Center (Ishikawa): AI data center campus record. Retrieved October 15, 2026, from https://registry.deploy.report/datacenters/highreso-shika-town-dc-ishikawa
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/highreso-shika-town-dc-ishikawa.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/highreso-shika-town-dc-ishikawa
- Data documentation: /data
- Query this programmatically: Deploy MCP