DEPLOYDatabase

Data center campus

Basis Bay Data Centre

Basis Bay Data Centre is a tracked AI data center campus in Cyberjaya. Basis Bay campus, Cyberjaya

Energized · Keppel Data Centres · Cyberjaya, Malaysia


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Basis Bay Data Centre capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Malaysia

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
~3-4 MW operational per REIT filings

On the data center map

No mappable coordinate is recorded for Basis Bay Data Centre yet. Location: Cyberjaya.

The deal

Power

Power source
grid
Interconnection

Why here

Basis Bay Data Centre is in Cyberjaya. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

60041aea-18a5-401f-aefe-c56f049bf58b · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Basis Bay Data Centre?
Basis Bay Data Centre is an AI data center campus tracked on the DEPLOY registry, located in Cyberjaya. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Basis Bay Data Centre?
Keppel Data Centres is recorded as a party to Basis Bay Data Centre on the DEPLOY registry. The full party list, with each role, is on the record.
Is Basis Bay Data Centre operating yet?
As of the most recent verification on the DEPLOY registry, Basis Bay Data Centre is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Basis Bay Data Centre?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Basis Bay Data Centre on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Basis Bay Data Centre: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/keppel-data-centres-basis-bay-data-centre

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces