DEPLOYDatabase

Data center campus

PsiQuantum Moreton Bay Quantum Facility

PsiQuantum Moreton Bay Quantum Facility is a tracked AI data center campus in Petrie, Queensland, Australia. PsiQuantum's Moreton Bay Central facility, on the repurposed site of the former Petrie Paper Mill north of Brisbane, is the anchor Asia-Pacific site for the company's plan to stand up the world's first utility-scale, fau

Under construction · PsiQuantum · owned · other · Petrie, Queensland, Australia


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
PsiQuantum Moreton Bay Quantum Facility capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Significance
World's first utility-scale fault-tolerant quantum computer
Groundbreaking
June 18, 2026
Investment
$940M AUD joint investment
Cryogenics
Linde Engineering cryoplant
Technology
Photonic quantum chips + optical fiber networking
Scale
Tens of thousands of photonic quantum chips
Founded
2016 (Palo Alto, CA)
Total funding
$2.32B across 8 rounds
Valuation
$7B (Series E, Sept 2025)
Operating temperature
~4 Kelvin (−269°C), warmer than most competing modalities
Chipset
Omega photonic quantum chipset, manufactured at GlobalFoundries
Target scale
Utility-scale, fault-tolerant, roadmap to 1M+ physical qubits
Networking
Standard telecom optical fiber; interconnects demonstrated to 250m
Site heritage
Former Petrie Paper Mill, repurposed for pre-existing industrial power and utility hookups
Cryoplant delivery
Linde Engineering cryoplant ordered late 2024, final delivery H2 2027
Federal investment
AUD $470M from Australian Commonwealth (equity + loan)
State investment
AUD $470M from Queensland Government (equity + loan)
Target completion
Operational quantum computer targeted by end of 2027
Co-located anchors
USC Moreton Bay campus and TAFE Centre of Excellence for advanced manufacturing
Site announcement
May 20, 2026 (site pivoted from Brisbane Airport)

On the data center map

Every tracked data center is on this map, centered on PsiQuantum Moreton Bay Quantum Facility. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

operator
PsiQuantum

Power

Power source
grid
Grid operator
other
Interconnection
Water
Cooling is dominated by a large custom Linde Engineering cryoplant operating around 4 Kelvin for the photonic chips (helium refrigeration cycle), not a conventional water-cooled DC loop. No municipal cooling-water figure has been disclosed.

Why here

PsiQuantum Moreton Bay Quantum Facility sits on owned in Petrie, Queensland, Australia. It connects to the other grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

PsiQuantum Moreton Bay joint investment (AUD $940M)
$615M press release

Sources

28953c23-02fe-450b-b21c-5ec9d0e82e2a · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is PsiQuantum Moreton Bay Quantum Facility?
PsiQuantum Moreton Bay Quantum Facility is an AI data center campus tracked on the DEPLOY registry, located in Petrie, Queensland, Australia. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building PsiQuantum Moreton Bay Quantum Facility?
PsiQuantum is recorded as a party to PsiQuantum Moreton Bay Quantum Facility on the DEPLOY registry. The full party list, with each role, is on the record.
Is PsiQuantum Moreton Bay Quantum Facility operating yet?
As of the most recent verification on the DEPLOY registry, PsiQuantum Moreton Bay Quantum Facility is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on PsiQuantum Moreton Bay Quantum Facility?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track PsiQuantum Moreton Bay Quantum Facility on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). PsiQuantum Moreton Bay Quantum Facility: AI data center campus record. Retrieved August 26, 2026, from https://registry.deploy.report/datacenters/psiquantum-moreton-bay-quantum-facility

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces