DEPLOYDatabase

Data center campus

Quantinuum Global Headquarters Broomfield

Quantinuum Global Headquarters Broomfield is a tracked AI data center campus in Broomfield, Colorado, USA. Quantinuum's global headquarters and largest operating site, at 303 South Technology Court in Broomfield, Colorado, houses hardware R&D, systems integration, and manufacturing for its H-Series and Helios trapped-ion quan

Energized · Quantinuum · owned · other · Broomfield, Colorado, USA


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Quantinuum Global Headquarters Broomfield capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Quantinuum

Developer

other

Grid

owned

Land

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Significance
World's largest integrated quantum computing company
Flagship system
Helios 98-qubit trapped-ion quantum computer
Ticker
Nasdaq: QNT
Oracle deal
Helios deployed in OCI AI data center (first US commercial DC, Aug 2026)
Global facilities
US, UK, Germany, Japan, Qatar, Singapore
Founded
December 2021 (Honeywell Quantum Solutions + Cambridge Quantum merger)
Predecessor
Honeywell Quantum Solutions (founded 2014)
CEO
Rajeeb (Raj) Hazra
Flagship system detail
98-qubit Helios trapped-ion QCCD (137Ba+ hyperfine qubits) with 99.921% two-qubit gate fidelity
Prior generations
H1 32-qubit (2023) and H2 56-qubit (2025) trapped-ion systems built here
Peer review
Helios benchmarks published in Nature (2026), co-validated with Sandia National Laboratories
Employees
500+ company-wide including 370+ scientists and engineers; Broomfield is largest operating site
Lab expansion
New optics and electromechanical engineering lab unveiled June 2023, more than 2x prior footprint
IPO
Nasdaq: QNT listed June 4, 2026 at $60/share, raised $1.68B in upsized IPO
Site role
Hardware R&D, systems integration, and manufacturing hub for H-Series and Helios quantum computers

On the data center map

Every tracked data center is on this map, centered on Quantinuum Global Headquarters Broomfield. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

operator
Quantinuum

Power

Power source
grid
Grid operator
other
Interconnection
Water
Trapped-ion QCCD systems use ultra-high vacuum chambers with laser cooling of 137Ba+ ions rather than dilution-refrigerator or water-based cooling; no significant process water use disclosed.

County water status: Extreme drought (D3) in Broomfield County, week of 2026-08-18 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Quantinuum Global Headquarters Broomfield sits on owned in Broomfield, Colorado, USA. It connects to the other grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

3bc58250-11b8-406e-b31b-7a046140a97d · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Quantinuum Global Headquarters Broomfield?
Quantinuum Global Headquarters Broomfield is an AI data center campus tracked on the DEPLOY registry, located in Broomfield, Colorado, USA. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Quantinuum Global Headquarters Broomfield?
Quantinuum is recorded as a party to Quantinuum Global Headquarters Broomfield on the DEPLOY registry. The full party list, with each role, is on the record.
Is Quantinuum Global Headquarters Broomfield operating yet?
As of the most recent verification on the DEPLOY registry, Quantinuum Global Headquarters Broomfield is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Quantinuum Global Headquarters Broomfield?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Quantinuum Global Headquarters Broomfield on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Quantinuum Global Headquarters Broomfield: AI data center campus record. Retrieved August 26, 2026, from https://registry.deploy.report/datacenters/quantinuum-quantum-hq-broomfield

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces