Data center campus
SK Group + AWS Ulsan AI Data Center
SK Group + AWS Ulsan AI Data Center is an AI data center campus developed by SK Telecom GPUaaS in Ulsan, Ulsan. 0.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · SK Telecom GPUaaS · Private land · other · Ulsan, Ulsan, South Korea
Capacity: announced vs energized
Announced-to-energized gap: 0.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.10 GW | 2025-06-01 | reported | journalist report |
| Under construction | 0.04 GW | 2025-06-01 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- AWS AI Zone / 15-year deal (primary)
- SK Group announced a partnership with AWS to build a data center in Ulsan for a new AWS AI Zone under a 15-year strategic deal, with operations expected to begin in 2027. SK leads construction; AWS establishes the AI Zone (SK, June 21 2025)
- Groundbreaking / role split (reported)
- The Korea Times reports an Aug 29, 2025 groundbreaking for SK AI Data Center Ulsan with SK Telecom, SK ecoplant, AWS, and the City of Ulsan. Press reports SK handles external infrastructure while AWS handles internal servers and customers (The Korea Times, Aug 29 2025)
- Phased MW / GPU count (reported)
- Korea Herald industry sources cited a ~36,000 sqm Mipo Industrial Complex site, about 60,000 GPUs, first phase ~40 MW by Nov 2027, and full ~103 MW by Feb 2029. Korea Times groundbreaking coverage used ~40 MW then ~100 MW phrasing. Treat as reported targets, not independently verified energized totals (The Korea Herald; The Korea Times, Aug 29 2025)
- Power / cooling design (reported)
- Korea Times reports adjacency to SK Multi Utility's ~300 MW LNG combined-cycle plant as a power supply, plus hybrid air/liquid cooling and high rack density (about 20-40 kW per rack power, 40-100 kW per rack cooling capacity cited) (The Korea Times, Aug 29 2025)
- Jobs claim / AWS Korea investment context (primary)
- SK's release says the Ulsan data center is expected to generate up to 78,000 direct and indirect jobs over time as it scales, and notes the partnership is in addition to AWS's previously stated ~$5.88 billion (about 7.85 trillion won) planned investment in Korea by 2027 (SK, June 21 2025)
On the data center map
Every tracked data center is on this map, centered on SK Group + AWS Ulsan AI Data Center. Pan or zoom out to see how close rivals are building.
- Announced capex
- $4B
- Jobs
- 78,000 permanent reported
- GPUs
- 60K 60,000 GPUs, largest deployment in any Korean data center
- Cost per MW
- $39M/MW
- Cost per job
- $51K per permanent job
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
The deal
- developer
- SK Telecom GPUaaS · Leads project; SK Group affiliates SK Broadband, SK Gas, SK Hynix participating
- operator
- Amazon Web Services (AWS) · 15-year strategic partnership; cloud operator/tenant
- utility
- SK Gas · Adjacent LNG combined-cycle power plant
Power
- Power source
- behind the meter gas
- Grid operator
- other
- Interconnection
SK Gas LNG combined-cycle power plant, gas, Energized. Adjacent LNG plant secures reliable power supply for the campus
Why here
SK Group + AWS Ulsan AI Data Center sits on private land in Ulsan, Ulsan. It connects to the other grid, draws on behind the meter gas power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- AWS contribution to project (~$4 billion)
- $4B journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Permanent jobs
- up to 78,000 direct and indirect jobs over time source
Timeline
- Aug 2026party linkeddeveloper: linked externalName "SK Telecom" to company skt-gpuaas
- Oct 2026Current: Under construction
Sources
- SK, AWS to build Korea's largest AI data center in Ulsan - The Korea Herald
- SK, AWS to build South Korea's largest, multibillion-dollar AI data center - KED Global
- SK Group and AWS Team Up to Build Cloud Computing Infrastructure - SK
- SK, AWS break ground for AI data center in Ulsan
b19de519-2b16-4f70-baee-26c45cc196a3 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is SK Group + AWS Ulsan AI Data Center?
How much power will SK Group + AWS Ulsan AI Data Center use?
Who is building SK Group + AWS Ulsan AI Data Center?
Is SK Group + AWS Ulsan AI Data Center operating yet?
How verified is the data on SK Group + AWS Ulsan AI Data Center?
Deploy Watch
Track SK Group + AWS Ulsan AI Data Center on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). SK Group + AWS Ulsan AI Data Center: AI data center campus record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/sk-aws-ulsan-ai-data-center
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/sk-aws-ulsan-ai-data-center.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/sk-aws-ulsan-ai-data-center
- Data documentation: /data
- Query this programmatically: Deploy MCP