Data center campus

SK Group + AWS Ulsan AI Data Center

SK Group + AWS Ulsan AI Data Center is an AI data center campus developed by SK Telecom in Ulsan, Ulsan. 0.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · SK Telecom · Private land · other · Ulsan, Ulsan, South Korea


Capacity: announced vs energized

Announced-to-energized gap: 0.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

SK Group + AWS Ulsan AI Data Center capacity claims
Source
Announced0.10 GW2025-06-01reportedjournalist report
Under construction0.04 GW2025-06-01reportedjournalist report

Key facts

0.10 GW

Announced

0 GW

Energized

SK Telecom

Developer

South Korea

Location

other

Grid

0.10 GW

Announced-to-energized gap

On the data center map

No mappable coordinate is recorded for SK Group + AWS Ulsan AI Data Center yet. Location: Ulsan.

The deal

developer
SK Telecom · Leads project; SK Group affiliates SK Broadband, SK Gas, SK Hynix participating
operator
Amazon Web Services (AWS) · 15-year strategic partnership; cloud operator/tenant
utility
SK Gas · Adjacent LNG combined-cycle power plant

Power

Power source
behind the meter gas
Grid operator
other
Interconnection

SK Gas LNG combined-cycle power plant, gas, Energized. Adjacent LNG plant secures reliable power supply for the campus

Why here

SK Group + AWS Ulsan AI Data Center sits on private land in Ulsan, Ulsan. It connects to the other grid, draws on behind the meter gas power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

AWS contribution to project (~$4 billion)
$4B journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Investment, workforce and specs

Permanent jobs
up to 78,000 direct and indirect jobs over time source

Timeline

  1. Aug 2026
    party added
    utility: SK Gas
  2. Aug 2026
    Current: Under construction

Sources

b19de519-2b16-4f70-baee-26c45cc196a3 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Common questions

What is SK Group + AWS Ulsan AI Data Center?
SK Group + AWS Ulsan AI Data Center is an AI data center campus tracked on the DEPLOY registry, located in Ulsan. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will SK Group + AWS Ulsan AI Data Center use?
SK Group + AWS Ulsan AI Data Center has 0.10 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building SK Group + AWS Ulsan AI Data Center?
SK Telecom is recorded as a party to SK Group + AWS Ulsan AI Data Center on the DEPLOY registry.
Is SK Group + AWS Ulsan AI Data Center operating yet?
As of the most recent verification on the DEPLOY registry, SK Group + AWS Ulsan AI Data Center is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on SK Group + AWS Ulsan AI Data Center?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track SK Group + AWS Ulsan AI Data Center on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). SK Group + AWS Ulsan AI Data Center: AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/sk-aws-ulsan-ai-data-center

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.