SoftBank Hokkaido Tomakomai AI Data Center

SoftBank Hokkaido Tomakomai AI Data Center is an AI data center campus developed by SoftBank Corp. in Hokkaido, Tomakomai. 0.30 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · SoftBank Corp. · other · Tomakomai, Hokkaido, Japan (JGSDF Trials)


Capacity: announced vs energized

Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2026. 4 months away. Claimed by SoftBank (source).

SoftBank Hokkaido Tomakomai AI Data Center capacity claims
Source
Announced0.30 GW2025-06-01claimedpress release
Under construction0.05 GW2025-06-01reportedjournalist report

Key facts

0.30 GW

Announced

0 GW

Energized

SoftBank Corp.

Developer

other

Grid

0.30 GW

Announced-to-energized gap

On the data center map

No mappable coordinate is recorded for SoftBank Hokkaido Tomakomai AI Data Center yet. Location: Tomakomai.

The deal

developer
SoftBank Corp.
operator
IDC Frontier Inc. · SoftBank subsidiary
financier
Japan Ministry of Economy, Trade and Industry (METI) · Subsidy of up to ¥30 billion

Power

Power source
other
Grid operator
other
Interconnection

100% locally-sourced Hokkaido renewable supply, other, Announced. Facility to operate entirely on renewable energy procured within Hokkaido Prefecture

Why here

SoftBank Hokkaido Tomakomai AI Data Center is in Hokkaido, Tomakomai. It connects to the other grid, draws on other power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Total project investment (~¥65 billion)
$456M journalist report
Japan METI subsidy (up to ¥30 billion)
up to $210M. Ministry of Economy, Trade and Industry subsidy journalist report
First-phase project cost (~65B yen)
$456M. Approx. USD equivalent of ~65 billion yen journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Investment, workforce and specs

Cooling
700,000 sqm site (~173 acres); part of SoftBank 'Brain DataCenter' initiative source

Timeline

  1. Aug 2026
    financial recorded
    capex: First-phase project cost (~65B yen)
  2. Aug 2026
    Current: Under construction

Sources

54a987fd-de69-42a8-8460-604b263334e5 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is SoftBank Hokkaido Tomakomai AI Data Center?
SoftBank Hokkaido Tomakomai AI Data Center is an AI data center campus tracked on the DEPLOY registry, located in Tomakomai. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will SoftBank Hokkaido Tomakomai AI Data Center use?
SoftBank Hokkaido Tomakomai AI Data Center has 0.30 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building SoftBank Hokkaido Tomakomai AI Data Center?
SoftBank Corp. is recorded as a party to SoftBank Hokkaido Tomakomai AI Data Center on the DEPLOY registry.
Is SoftBank Hokkaido Tomakomai AI Data Center operating yet?
As of the most recent verification on the DEPLOY registry, SoftBank Hokkaido Tomakomai AI Data Center is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on SoftBank Hokkaido Tomakomai AI Data Center?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track SoftBank Hokkaido Tomakomai AI Data Center on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). SoftBank Hokkaido Tomakomai AI Data Center: AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/softbank-hokkaido-tomakomai-ai-data-center

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces