Data center campus
SoftBank Hokkaido Tomakomai AI Data Center
SoftBank Hokkaido Tomakomai AI Data Center is an AI data center campus developed by SoftBank Corp. in Hokkaido, Tomakomai. 0.30 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · SoftBank Corp. · other · Tomakomai, Hokkaido, Japan
Capacity: announced vs energized
Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2026. 3 months away. Claimed by SoftBank (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.30 GW | 2025-06-01 | claimed | press release |
| Under construction | 0.05 GW | 2025-06-01 | reported | journalist report |
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Groundbreaking Apr 15 2025 / SoftBank + IDC Frontier (primary)
- On April 15, 2025, SoftBank Corp. and subsidiary IDC Frontier held a groundbreaking ceremony for the Hokkaido Tomakomai AI Data Center in Tomakomai City, Hokkaido. SoftBank frames the campus as a core facility for its Brain DataCenter concept under a next-generation social infrastructure push to decentralize data processing and energy use away from Tokyo/Osaka concentration (SoftBank News, May 1 2025; IDC Frontier, Apr 18 2025)
- 700,000 sqm / >300 MW design / FY2026 ops (primary)
- SoftBank states the Tomakomai campus is expected to become one of Japan's largest AI data centers, with an area of 700,000 square meters and power capacity expected to exceed 300 megawatts, scheduled to begin operations in fiscal 2026 (year ending March 2027). Treat the >300 MW figure as SoftBank's stated design/expansion outlook, not as currently energized IT load (SoftBank News, May 1 2025; SoftBank News, Feb 25 2026)
- 100% Hokkaido renewable / local offtake (primary)
- SoftBank and IDC Frontier describe the facility as designed to operate entirely on renewable energy procured locally within Hokkaido Prefecture (company framing: local-production / local-consumption renewable power for the AI campus) (SoftBank News, May 1 2025; IDC Frontier, Apr 18 2025)
- Construction progress / METI subsidy framing (primary)
- In a Feb 25, 2026 SoftBank News interview, SoftBank DC engineering staff said plans advanced since around 2023 and estimated the project about 60 to 70 percent complete toward a fiscal 2026 opening, noting a METI subsidy and ecological surveys during construction. Treat the percent-complete figure as SoftBank staff characterization at interview time (SoftBank News, Feb 25 2026)
On the data center map
No mappable coordinate is recorded for SoftBank Hokkaido Tomakomai AI Data Center yet. Location: Tomakomai.
- Announced capex
- $456M
- Cooling
- 700,000 sqm site (~173 acres); part of SoftBank 'Brain DataCenter' initiative
- Cost per MW
- $2M/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
The deal
- developer
- SoftBank Corp.
- operator
- IDC Frontier Inc. · SoftBank subsidiary
- financier
- Japan Ministry of Economy, Trade and Industry (METI) · Subsidy of up to ¥30 billion
Power
- Power source
- other
- Grid operator
- other
- Interconnection
100% locally-sourced Hokkaido renewable supply, other, Announced. Facility to operate entirely on renewable energy procured within Hokkaido Prefecture
Why here
SoftBank Hokkaido Tomakomai AI Data Center is in Hokkaido, Tomakomai. It connects to the other grid, draws on other power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Total project investment (~¥65 billion)
- $456M journalist report
- Japan METI subsidy (up to ¥30 billion)
- up to $210M. Ministry of Economy, Trade and Industry subsidy journalist report
- First-phase project cost (~65B yen)
- $456M. Approx. USD equivalent of ~65 billion yen journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Cooling
- 700,000 sqm site (~173 acres); part of SoftBank 'Brain DataCenter' initiative source
Timeline
- Aug 2026financial recordedcapex: First-phase project cost (~65B yen)
- Oct 2026Current: Under construction
Sources
- Laying the Foundation for the AI Era: Construction Begins on 'Hokkaido Tomakomai AI Data Center' - SoftBank News
- SoftBank breaks ground for AI data center in Hokkaido - w.media
- Building for the AI Era: An Inside Look at SoftBank Corp.'s Next-generation AI Data Center in Hokkaido
- Hokkaido Tomakomai Data Center groundbreaking ceremony held
54a987fd-de69-42a8-8460-604b263334e5 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is SoftBank Hokkaido Tomakomai AI Data Center?
How much power will SoftBank Hokkaido Tomakomai AI Data Center use?
Who is building SoftBank Hokkaido Tomakomai AI Data Center?
Is SoftBank Hokkaido Tomakomai AI Data Center operating yet?
How verified is the data on SoftBank Hokkaido Tomakomai AI Data Center?
Deploy Watch
Track SoftBank Hokkaido Tomakomai AI Data Center on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). SoftBank Hokkaido Tomakomai AI Data Center: AI data center campus record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/softbank-hokkaido-tomakomai-ai-data-center
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/softbank-hokkaido-tomakomai-ai-data-center.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/softbank-hokkaido-tomakomai-ai-data-center
- Data documentation: /data
- Query this programmatically: Deploy MCP