Data center campus

STT Palava Campus

STT Palava Campus is a tracked AI data center campus in Palava (Mumbai region).

Under construction · ST Telemedia Global Data Centres · Palava (Mumbai region), India


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
STT Palava Campus capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
171 MW (Palava 1 50 MW + Palava 4 60.5 MW + Palava 5 60.5 MW announced)

On the data center map

No mappable coordinate is recorded for STT Palava Campus yet. Location: Palava (Mumbai region).

The deal

Power

Power source
grid
Interconnection

Why here

STT Palava Campus is in Palava (Mumbai region). It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Sources

7c3dffb1-69f1-4fb1-b750-c0249138f3d2 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is STT Palava Campus?
STT Palava Campus is an AI data center campus tracked on the DEPLOY registry, located in Palava (Mumbai region). DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building STT Palava Campus?
ST Telemedia Global Data Centres is recorded as a party to STT Palava Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is STT Palava Campus operating yet?
As of the most recent verification on the DEPLOY registry, STT Palava Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on STT Palava Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track STT Palava Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). STT Palava Campus: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/stt-gdc-stt-palava-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces