DEPLOYDatabase

Data center campus

STT Seoul 1

STT Seoul 1 is a tracked AI data center campus in Seoul, South Korea.

Energized · ST Telemedia Global Data Centres · Seoul, South Korea


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
STT Seoul 1 capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
30 MW (30 MW IT load)

On the data center map

Every tracked data center is on this map, centered on STT Seoul 1. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

Power

Power source
grid
Interconnection

Why here

STT Seoul 1 is in Seoul, South Korea. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

e8f5f893-4265-4e5d-a2dc-9074079b403e · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is STT Seoul 1?
STT Seoul 1 is an AI data center campus tracked on the DEPLOY registry, located in Seoul, South Korea. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building STT Seoul 1?
ST Telemedia Global Data Centres is recorded as a party to STT Seoul 1 on the DEPLOY registry. The full party list, with each role, is on the record.
Is STT Seoul 1 operating yet?
As of the most recent verification on the DEPLOY registry, STT Seoul 1 is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on STT Seoul 1?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track STT Seoul 1 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). STT Seoul 1: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/stt-gdc-stt-seoul-1

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces