Ubitus Maizuru AI Data Center is a tracked AI data center campus in Maizuru, Kyoto, Japan. Ubitus's planned NVIDIA Blackwell AI data center in Maizuru City, Kyoto (~2.3 hectares), backed by a JPY 17B METI Large-Scale Growth Investment grant and UTokyo IPC investment. Land agreement signed; construction expecte
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- METI grant / JPY 17B Blackwell NeoCloud (primary)
- On Dec 18, 2025, Ubitus announced selection for METI's Large-Scale Growth Investment Grant for Medium-Sized and Small Enterprises for its 'Regional Distributed GPU Infrastructure Development for the Generative AI Era' project, with total investment of JPY 17 billion dedicated to expanding cloud infrastructure powered by NVIDIA Blackwell GPUs and NeoCloud (Ubitus, Dec 18 2025)
- Maizuru land agreement / 2.3 ha (primary)
- On Jan 29, 2026, Ubitus announced a land signing ceremony with Maizuru City, Kyoto Prefecture, for an AI data center on approximately 2.3 hectares (about 23,000 square meters). The company said construction was expected to begin in 2026 with major development targeted for completion within 2027, in phased buildout supporting generative AI and LLM demand (Ubitus, Jan 29 2026)
- NVIDIA Blackwell x NeoCloud design (primary)
- Ubitus states the Maizuru AI Data Center will fully adopt NVIDIA's Blackwell GPU architecture for high-efficiency training and inference, with overall computing architecture centered on NeoCloud hierarchical scheduling, distributed computing, and flexible resource management. No published MW capacity figure is stated in these company releases (Ubitus, Jan 29 2026; Ubitus, Dec 18 2025)
- Groundbreaking Sep 4 2026 (primary)
- On Sept 9, 2026, Ubitus announced it held a groundbreaking ceremony for the Maizuru AI Data Center at 10:00 a.m. on Sept 4, 2026, marking transition from planning into full-scale construction after the January land agreement. The release reiterates the ~2.3 hectare phased campus with NVIDIA Blackwell GPUs and NeoCloud (Ubitus, Sept 9 2026)
- Phased build / port-logistics site (primary)
- Ubitus's Jan 29, 2026 land release says Maizuru will use phased construction: Phase 1 builds the data center and core operations, Phase 2 expands capacity for generative AI and LLM demand, with construction expected to begin in 2026 and major development targeted for completion within 2027. The site is described as near port and logistics facilities with favorable land and infrastructure readiness. No published MW capacity figure is stated (Ubitus, Jan 29 2026)
- Site selection / stable power framing (primary)
- Ubitus lists Maizuru site-selection strengths as stable power supply conditions, disaster-risk-aware siting, well-developed port and logistics infrastructure, and coordinated government-private collaboration, framing the city as balancing stability, scalability, and long-term operational requirements for high-density AI compute (Ubitus, Jan 29 2026)
- GENIAC 405B / Chokimaru Maizuru AI (primary)
- Ubitus's METI grant release and land announcement place Maizuru within a longer Japan AI path: 2024 selection for METI's GENIAC program to develop a 405-billion-parameter East Asia LLM (Japanese, Traditional Chinese, English), and 2025 launch of a tourism/cultural AI language model with Maizuru virtual guide 'Chokimaru' offering real-time multilingual Q&A. The 2025 METI Large-Scale Growth Investment grant then funds multi-region Blackwell NeoCloud GPU infrastructure (Ubitus, Dec 18 2025; Ubitus, Jan 29 2026)
On the data center map
Every tracked data center is on this map, centered on Ubitus Maizuru AI Data Center. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
The deal
- chip supplier
- NVIDIA · Blackwell (NeoCloud).
- operator
- Ubitus · Ubitus K.K.
Why here
Ubitus Maizuru AI Data Center is in Maizuru, Kyoto, Japan. This siting summary is composed from the record's held fields, not speculation; see methodology.
Timeline
- Aug 2026party addedchip_supplier: NVIDIA
- Oct 2026Current: Announced
Sources
- Ubitus Partners with Maizuru City, Kyoto to Launch AI Data Center Project · Ubitus
- Ubitus Receives Major METI Investment Grant (JPY 17 Billion) · Ubitus
- Ubitus Holds Groundbreaking Ceremony for Maizuru AI Data Center, Marking the Start of the Construction Phase
2a8e6be0-5938-4350-bc26-abffcbf56365 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is Ubitus Maizuru AI Data Center (Kyoto)?
Who is building Ubitus Maizuru AI Data Center (Kyoto)?
Is Ubitus Maizuru AI Data Center (Kyoto) operating yet?
How verified is the data on Ubitus Maizuru AI Data Center (Kyoto)?
Deploy Watch
Track Ubitus Maizuru AI Data Center (Kyoto) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Ubitus Maizuru AI Data Center (Kyoto): AI data center campus record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/ubitus-maizuru-ai-data-center
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/ubitus-maizuru-ai-data-center.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/ubitus-maizuru-ai-data-center
- Data documentation: /data
- Query this programmatically: Deploy MCP