DEPLOYDatabase

Data center campus

UzCloud Data Center (Tashkent)

UzCloud Data Center is a tracked AI data center campus in Tashkent, Uzbekistan. UzCloud (Uzbektelecom) runs its NVIDIA DGX B200 GPU-as-a-service from a Tier III-certified data center in the Zangiata district of Tashkent, one of a five-site national network (Akhangaran, Tashkent, Bukhara, Kokand) wit

Energized · UzCloud · Tashkent, Uzbekistan


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
UzCloud Data Center (Tashkent) capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

UzCloud

Developer

On the data center map

Every tracked data center is on this map, centered on UzCloud Data Center. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

The deal

operator
UzCloud · Uzbektelecom's national sovereign cloud; DGX B200 GPUaaS.
chip supplier
NVIDIA · DGX B200 (8x B200/node).

Why here

UzCloud Data Center is in Tashkent, Uzbekistan. This siting summary is composed from the record's held fields, not speculation; see methodology.

Timeline

  1. Aug 2026
    party added
    chip_supplier: NVIDIA
  2. Aug 2026
    Current: Energized

Sources

e1e26aad-846d-4a3d-8e31-e3add12c83c4 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Common questions

What is UzCloud Data Center (Tashkent)?
UzCloud Data Center (Tashkent) is an AI data center campus tracked on the DEPLOY registry, located in Tashkent, Uzbekistan. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building UzCloud Data Center (Tashkent)?
UzCloud is recorded as a party to UzCloud Data Center (Tashkent) on the DEPLOY registry. The full party list, with each role, is on the record.
Is UzCloud Data Center (Tashkent) operating yet?
As of the most recent verification on the DEPLOY registry, UzCloud Data Center (Tashkent) is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on UzCloud Data Center (Tashkent)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track UzCloud Data Center (Tashkent) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). UzCloud Data Center (Tashkent): AI data center campus record. Retrieved August 31, 2026, from https://registry.deploy.report/datacenters/uzcloud-tashkent-data-center

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces