DEPLOYDatabase

Data center campus

Yotta D1

Yotta D1 is a tracked AI data center campus in Greater Noida. Hosts Yotta's Shakti Cloud AI GPU cluster (H100). Part of a planned 6-building, ~250 MW campus.

Energized · Yotta Data Services · Greater Noida, India


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Yotta D1 capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

India

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
30 MW (30 MW operational, expandable to 50 MW (campus master-planned to ~250 MW across multiple buildings))
Named tenants
Microsoft, NVIDIA (Shakti Cloud GPU deployment)

On the data center map

No mappable coordinate is recorded for Yotta D1 yet. Location: Greater Noida.

The deal

Power

Power source
grid
Interconnection

Why here

Yotta D1 is in Greater Noida. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Sources

1c9cce71-0ceb-4bc8-a904-bee53090be69 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Yotta D1?
Yotta D1 is an AI data center campus tracked on the DEPLOY registry, located in Greater Noida. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Yotta D1?
Yotta Data Services is recorded as a party to Yotta D1 on the DEPLOY registry. The full party list, with each role, is on the record.
Is Yotta D1 operating yet?
As of the most recent verification on the DEPLOY registry, Yotta D1 is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Yotta D1?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Yotta D1 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Yotta D1: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/yotta-data-services-yotta-d1

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces