Deployment
Apis Cor Mobile Printer at Dubai
Apis Cor's mobile construction 3D printer, paired with an automated mix-and-supply unit, prints building walls on site; it produced the largest 3D-printed building, a two-story structure in Dubai.
Apis Cor Mobile Printer by Apis Cor · Catalog entry · 1 source · not yet field-verified · Construction robots
Recent coverage
- Space Coast home to 3-D printed, affordable homes - Central Florida Public MediaGoogle News · 2024-12-09
- Habitat for Humanity begins 3D printed home construction in Melbourne - Florida TodayGoogle News · 2024-12-06
- Top 10: 3D Construction Printing Companies - Construction DigitalGoogle News · 2024-11-13
Apis Cor 3D-printed the walls of a two-story administrative building for Dubai Municipality, at the time described as the world's largest 3D-printed building (about 640 square meters, roughly 9.5 meters tall). The portable Apis Cor printer was moved around the site by crane and printed the structure on location. Dubai Municipality commissioned and owns the building; Apis Cor was the printing contractor.
Key facts
- Site
- Dubai Municipality administrative building, Dubai, UAE
- Owner
- Dubai Municipality
- Scale
- About 640 square meters, two stories, about 9.5 meters tall
- Distinction
- Described as the world's largest 3D-printed building at completion
- Method
- Portable printer repositioned around the site by crane
Exposure
- Customer segment
- logistics
- Scale tier
- commercial 10 99
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
No incidents on record for Apis Cor Mobile Printer at Dubai.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-21
- Company
- Apis Cor
- Location
- United Arab Emirates/Dubai
- Operator
- Apis Cor
- Status
- operational
- Operator type
- maker operated
- Scale at site
- 11 to 100 units
- Site environment
- outdoor
- Location precision
- verified coordinates
- First seen
- 2019-12-01
- ID
23384152-0051-4e9a-8f93-4a05bd734513
Timeline
- Dec 2019First recordedApis Cor Mobile Printer first documented operating at Dubai.
- Aug 2026Current status: operational, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Apis Cor Mobile Printer operates in Dubai. Explore the full verified map:
Sources (1)
Methodology: Verified · 1 source (no primary) · last reviewed 2026-08-21
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-08-21
Maturity + lifecycle
Maturity stage: commercial
Lifecycle: active
Architectural position
Cohort: construction
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Apis Cor Mobile Printer at Dubai.Common questions
What is the Apis Cor Mobile Printer deployment at Dubai?
Who operates Apis Cor Mobile Printer at Dubai?
When did the Apis Cor Mobile Printer deployment at Dubai go live?
Have there been incidents at the Apis Cor Mobile Printer deployment at Dubai?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/apis-cor-dubai-municipality-building.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/23384152-0051-4e9a-8f93-4a05bd734513
- Data documentation: /data
- Query this programmatically: Deploy MCP