Deployment
Atlas at New York New Jersey Stadium
Boston Dynamics' all-electric humanoid robot, announced April 2024 as a full redesign from the earlier hydraulic Atlas research platform. The electric Atlas stands 1.9 m (6.2 ft), weighs 90 kg, and features 56 degrees of freedom with a 2.3 m reach, 30 kg sustained payload, IP67 sealing, and a 4-hour battery with autonomous self-swap capability. Initial deployment is at Hyundai's Robotics Metaplant Application Center (RMAC) performing part sequencing, machine tending, and order-building; broader customer rollout is planned for 2027.
Atlas by Boston Dynamics · Catalog entry · 1 source · not yet field-verified · Humanoids
Recent coverage
- Boston Dynamics gives more insight into its redesigned humanoid handThe Robot Report · 2026-10-09
- Boston Dynamics unveils 13-DOF four finger hand for AtlasHumanoid.guide · 2026-10-03
- Boston Dynamics unveils new four-finger hand for Atlas humanoid robotRobotics and Automation News · 2026-10-02
Atlas stepped onto the field during halftime of the FIFA World Cup 2026 Norway-Brazil round of 16 match and presented the ceremonial match ball. Boston Dynamics calls it the first ever robotic halftime activation of the FIFA World Cup and the first public appearance of its production Atlas.
Key facts
- Match
- Norway-Brazil Round of 16
- Milestone
- First robotic FIFA World Cup halftime activation, per Boston Dynamics
- First
- Public appearance of production Atlas, per Boston Dynamics
Safety record
No incidents on record for Atlas at New York New Jersey Stadium.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-10-31
- Model
- Atlas
- Company
- Boston Dynamics
- Location
- New York New Jersey Stadium
- Operator
- Boston Dynamics
- Status
- operational
- First seen
- 2026-07-05
- ID
c96605e8-fd6f-4986-89b7-3af4f3f975fe
Timeline
- Jul 2026First recordedAtlas first documented operating at New York New Jersey Stadium.
- Oct 2026Current status: operational, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Atlas operates in New York New Jersey Stadium. Explore the full verified map:
Sources (1)
Methodology: Verified · 1 source (no primary) · last reviewed 2026-10-31
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-10-31
Maturity + lifecycle
Maturity stage: pilot
Lifecycle: active
Architectural position
Cohort: humanoid
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Atlas at New York New Jersey Stadium.Common questions
What is the Atlas deployment at New York New Jersey Stadium?
Who operates Atlas at New York New Jersey Stadium?
When did the Atlas deployment at New York New Jersey Stadium go live?
Have there been incidents at the Atlas deployment at New York New Jersey Stadium?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/bd-atlas-fifa-world-cup-halftime-2026.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/c96605e8-fd6f-4986-89b7-3af4f3f975fe
- Data documentation: /data
- Query this programmatically: Deploy MCP