Deployment
Atlas at New York New Jersey Stadium
Boston Dynamics' all-electric humanoid robot, announced April 2024 as a full redesign from the earlier hydraulic Atlas research platform. The electric Atlas stands 1.9 m (6.2 ft), weighs 90 kg, and features 56 degrees of freedom with a 2.3 m reach, 30 kg sustained payload, IP67 sealing, and a 4-hour battery with autonomous self-swap capability. Initial deployment is at Hyundai's Robotics Metaplant Application Center (RMAC) performing part sequencing, machine tending, and order-building; broader customer rollout is planned for 2027.
Atlas by Boston Dynamics · Unverified · Humanoids
Recent coverage
- Electra selects Atlas to supply EL9 test airframesAerospace Testing International · 2026-09-16
- World’s largest atlas of universe’s gas bodies compiled, could decode how galaxies form, evolveInteresting Engineering · 2026-09-10
- Volkswagen ID. Buzz gains a new rear view camera system and more for 2027Electrek · 2026-09-10
Atlas robot stepped onto the field during halftime of FIFA World Cup 2026 Norway-Brazil round of 16 match. First ever robotic halftime activation of FIFA World Cup. Presented ceremonial match ball. First public appearance of production Atlas.
Safety record
No incidents on record for Atlas at New York New Jersey Stadium.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Unverifiedhow tiers work →
- Last updated
- 2026-08-27
- Model
- Atlas
- Company
- Boston Dynamics
- Location
- New York New Jersey Stadium
- Operator
- Boston Dynamics
- Status
- operational
- First seen
- 2026-07-05
- ID
c96605e8-fd6f-4986-89b7-3af4f3f975fe
Timeline
- Jul 2026First recordedAtlas first documented operating at New York New Jersey Stadium.
- Aug 2026Current status: operationalLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Atlas operates in New York New Jersey Stadium. Explore the full verified map:
Sources (1)
Methodology: Unreviewed · 1 source (no primary) · last reviewed 2026-08-27
Verification posture
Unreviewed
Low confidence
Review state
Stable
Last reviewed 2026-08-27
Maturity + lifecycle
Maturity stage: pilot
Lifecycle: active
Architectural position
Cohort: humanoid
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Atlas at New York New Jersey Stadium.Common questions
What is the Atlas deployment at New York New Jersey Stadium?
Who operates Atlas at New York New Jersey Stadium?
When did the Atlas deployment at New York New Jersey Stadium go live?
Have there been incidents at the Atlas deployment at New York New Jersey Stadium?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/bd-atlas-fifa-world-cup-halftime-2026.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/c96605e8-fd6f-4986-89b7-3af4f3f975fe
- Data documentation: /data
- Query this programmatically: Deploy MCP