Deployment
ALIA-250 at Plattsburgh
All-electric fixed-wing VTOL aircraft with lift+cruise configuration. 250 nm range, 1400 lb payload. FAA Type Certificate application. UPS Flight Forward launch cargo customer. Vertiport network development active.
ALIA-250 by Beta Technologies · Catalog entry · 2 sources · not yet field-verified · Drones
Recent coverage
- USA launches nationwide eVTOL operational trials program - Aerospace Testing InternationalGoogle News · 2026-03-11
- Electric Plane Maker Beta Technologies Raises $1 Billion in IPO - Bloomberg.comGoogle News · 2025-11-03
- Electric Aircraft Firm Beta Technologies Files for US IPO - Bloomberg.comGoogle News · 2025-09-29
Beta Technologies Alia-250 eVTOL test flights at Plattsburgh International Airport, NY. Cargo and passenger variants under FAA certification. Charging network deployed along US East Coast.
Key facts
- Fleet
- Beta Technologies ALIA-250 eVTOL
- Operator
- Beta Technologies
- Coverage
- Plattsburgh International Airport, NY
- Use Case
- Cargo and passenger variants
- Regulatory
- Under FAA certification
- Technology
- Charging network deployed along US East Coast
Exposure
- Customer segment
- logistics
- Scale tier
- commercial 10 99
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
No incidents on record for ALIA-250 at Plattsburgh.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 2 sources · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-21
- Model
- ALIA-250
- Company
- Beta Technologies
- Location
- United States/New York/Plattsburgh
- Operator
- Beta Technologies
- Status
- operational
- Operator type
- maker operated
- Scale at site
- 11 to 100 units
- Site environment
- outdoor
- Location precision
- verified coordinates
- First seen
- 2024-06-01
- ID
a4889e03-2073-45a2-b4f3-3617f04ae951
Timeline
- Jun 2024First recordedALIA-250 first documented operating at Plattsburgh.
- Jun 2026created
- Aug 2026Current status: operational, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
ALIA-250 operates in Plattsburgh. Explore the full verified map:
Sources (2)
Methodology: Verified · 2 sources (no primary) · last reviewed 2026-08-21
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-08-21
Maturity + lifecycle
Maturity stage: development
Lifecycle: active
Architectural position
Cohort: aerial
Sources by quality tier
- 2
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for ALIA-250 at Plattsburgh.Common questions
What is the ALIA-250 deployment at Plattsburgh?
Who operates ALIA-250 at Plattsburgh?
When did the ALIA-250 deployment at Plattsburgh go live?
Have there been incidents at the ALIA-250 deployment at Plattsburgh?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/beta-test-flights-vermont.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/a4889e03-2073-45a2-b4f3-3617f04ae951
- Data documentation: /data
- Query this programmatically: Deploy MCP