Deployment
DataOne AI Factory at Vineland, New Jersey, USA
Hyperscale AI data center infrastructure engineered for high-density GPU workloads, featuring direct liquid cooling, power densities of 60-500kW per rack, and PUE of 1.06-1.15. Deployed at 400MW scale in France and 300MW in Vineland, NJ.
DataOne AI Factory by DataOne · Catalog entry · 1 source · not yet field-verified
300MW AI data center built for Nebius with 10-year tenant commitment. Facility generates 85% of its own power using natural gas, with 32 high-efficiency gas engines and 6 diesel generators. Originally planned as 2.4M sqft, scaled to ~718K sqft. Construction underway as of 2026.
Key facts
- Capacity
- 300MW
- Tenant
- Nebius (10-year lease)
- Power generation
- 85% on-site natural gas
Exposure
- Customer segment
- construction
- Scale tier
- pilot lt10
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
2 incidents on record (2 moderate). Most recent: Mar 2026.
- moderate
- 2
Most recent: Mar 2026
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
Incidents on record (2)
- Vineland NJ residents protest DataOne AI data center over environmental and health concerns2026-03-19 · Regulatory action
- Vineland NJ residents protest DataOne 350MW AI data center over noise, emissions, and water concerns2026-02-08 · Regulatory action
Direct incidents recorded against this deployment. Retracted incidents are excluded here but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-21
- Model
- DataOne AI Factory
- Company
- DataOne
- Location
- Vineland, New Jersey, USA
- Operator
- DataOne
- Status
- operational
- Scale at site
- 2 to 10 units
- Site environment
- outdoor
- Location precision
- verified coordinates
- First seen
- 2025-03-06
- ID
115093a3-d340-40c4-b90d-86992ab99f02
Timeline
- Mar 2025First recordedDataOne AI Factory first documented operating at Vineland, New Jersey, USA.
- Aug 2026Current status: operational, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
DataOne AI Factory operates in Vineland, New Jersey, USA. Explore the full verified map:
Sources (1)
- DataOne and Nebius Partner for New US 300MW AI Data Centre · https://datacentremagazine.com/articles/dataone-and-nebius-partner-for-new-300mw-ai-data-centre · 2025-03-06
Methodology: Verified · 1 source (no primary) · last reviewed 2026-08-21
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-08-21
Maturity + lifecycle
Maturity stage: production
Lifecycle: active
Architectural position
Cohort: other
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for DataOne AI Factory at Vineland, New Jersey, USA.Common questions
What is the DataOne AI Factory deployment at Vineland, New Jersey, USA?
Who operates DataOne AI Factory at Vineland, New Jersey, USA?
When did the DataOne AI Factory deployment at Vineland, New Jersey, USA go live?
Have there been incidents at the DataOne AI Factory deployment at Vineland, New Jersey, USA?
Is DataOne AI Factory at Vineland, New Jersey, USA safe?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/dataone-ai-factory-vineland-new-jersey-usa.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/115093a3-d340-40c4-b90d-86992ab99f02
- Data documentation: /data
- Query this programmatically: Deploy MCP