DataOne AI Factory at Grenoble and Lyon, France

Hyperscale AI data center infrastructure engineered for high-density GPU workloads, featuring direct liquid cooling, power densities of 60-500kW per rack, and PUE of 1.06-1.15. Deployed at 400MW scale in France and 300MW in Vineland, NJ.

DataOne AI Factory by DataOne · Unverified


Giga-scale AI hosting data centre campus across Grenoble (Eybens) and Lyon (Villefontaine), France. Currently 15MW IT load across 50,000 sqm on 14 hectares. Targeting 400MW by 2028, powered by EDF hydroelectric and nuclear energy with zero-carbon operations. ISO 27001, 14001, 50001, and SOC 1 and 2 certified.

Key facts

Current capacity
15MW (80MW target April 2025)
Target capacity
400MW by 2028
Energy
100% renewable (EDF hydroelectric + nuclear backup)

Safety record

No incidents on record for DataOne AI Factory at Grenoble and Lyon, France.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Trust tier
Unverifiedhow tiers work →
Last updated
2026-08-19
Company
DataOne
Operator
DataOne
Status
operational
First seen
2024-11-26
ID
57ca2ca0-d561-40db-8938-7b1326260986

Timeline

  1. Nov 2024
    First recorded
    DataOne AI Factory first documented operating at Grenoble and Lyon, France.
  2. Aug 2026
    Current status: operational
    Latest recorded state. New status transitions append here as the deployment-status recorder produces them.

On the deployment map

Operates worldwide

DataOne AI Factory is deployed globally rather than at a single verified site, so there is no map pin.

Free to use on your site, with a link back to DEPLOY.

DataOne AI Factory operates in Grenoble and Lyon, France. Explore the full verified map:

Sources (1)

  1. BSO Unveils DataOne: Europe's First Giga-Scale AI Hosting Data Centre · https://www.bso.co/all-insights/bso-unveils-dataone-europes-first-giga-scale-ai-hosting-data-centre · 2024-11-26
Methodology: Unreviewed · 1 source (no primary) · last reviewed 2026-08-19

Verification posture

Unreviewed

Low confidence

Review state

Stable

Last reviewed 2026-08-19

Maturity + lifecycle

Maturity stage: production

Lifecycle: active

Architectural position

Cohort: other

Sources by quality tier

1
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for DataOne AI Factory at Grenoble and Lyon, France.

Common questions

What is the DataOne AI Factory deployment at Grenoble and Lyon, France?
DataOne AI Factory, built by DataOne, is recorded as a deployment at Grenoble and Lyon, France on the DEPLOY registry. DataOne operates the deployment directly.
Who operates DataOne AI Factory at Grenoble and Lyon, France?
DataOne, the manufacturer of DataOne AI Factory, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
When did the DataOne AI Factory deployment at Grenoble and Lyon, France go live?
The deployment is recorded as starting November 26, 2024 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.
Have there been incidents at the DataOne AI Factory deployment at Grenoble and Lyon, France?
No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.