DEPLOYDatabase

Deployment

Eve eVTOL at Higashi-Shinjuku Substation, Tokyo, Japan

Eve's lift-plus-cruise electric vertical takeoff and landing (eVTOL) aircraft, designed for urban air mobility. The full-scale engineering prototype completed its first flight on December 19, 2025 at Embraer's test facility in Brazil, with 50+ successful flights by April 2026. The aircraft features fly-by-wire controls and advanced energy management, with certification being pursued with FAA and ANAC.

Eve eVTOL by Eve Air Mobility · Unverified

Recent coverage

See all coverage →


AirX signs firm order agreement for two Eve eVTOL aircraft. Sightseeing routes and last-mile missions in Tokyo and Osaka Japan.

Safety record

No incidents on record for Eve eVTOL at Higashi-Shinjuku Substation, Tokyo, Japan.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Trust tier
Unverifiedhow tiers work →
Last updated
2026-08-27
Status
announced
First seen
2026-01-01
ID
654879a7-882c-45f7-ae84-74180e7d712c

Timeline

  1. Jan 2026
    First recorded
    Eve eVTOL first documented operating at Higashi-Shinjuku Substation, Tokyo, Japan.
  2. Aug 2026
    Current status: announced
    Latest recorded state. New status transitions append here as the deployment-status recorder produces them.

On the deployment map

Free to use on your site, with a link back to DEPLOY.

Eve eVTOL operates in Higashi-Shinjuku Substation, Tokyo, Japan. Explore the full verified map:

Sources (1)

  1. https://www.eveairmobility.com/airx-signs-firm-order-agreement-with-eve-air-mobility-for-two-evtol-aircraft/ · 2026-01-01
Methodology: Unreviewed · 1 source (no primary) · last reviewed 2026-08-27

Verification posture

Unreviewed

Low confidence

Review state

Stable

Last reviewed 2026-08-27

Maturity + lifecycle

Maturity stage: research

Lifecycle: active

Architectural position

Cohort: other

Sources by quality tier

1
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for Eve eVTOL at Higashi-Shinjuku Substation, Tokyo, Japan.

Common questions

What is the Eve eVTOL deployment at Higashi-Shinjuku Substation, Tokyo, Japan?
Eve eVTOL, built by Eve Air Mobility, is recorded as a deployment at Higashi-Shinjuku Substation, Tokyo, Japan on the DEPLOY registry. Eve Air Mobility operates the deployment directly.
Who operates Eve eVTOL at Higashi-Shinjuku Substation, Tokyo, Japan?
Eve Air Mobility, the manufacturer of Eve eVTOL, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
When did the Eve eVTOL deployment at Higashi-Shinjuku Substation, Tokyo, Japan go live?
The deployment is recorded as starting January 1, 2026 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.
Is the Eve eVTOL deployment at Higashi-Shinjuku Substation, Tokyo, Japan still active?
As of the most recent verification on the DEPLOY registry, this deployment is announced but not yet operating.
Have there been incidents at the Eve eVTOL deployment at Higashi-Shinjuku Substation, Tokyo, Japan?
No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.

Deploy Watch

Track this deployment.

We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.

Machine-readable surfaces