Deployment
FB3 at North Sea (Hornsea 1&2, Walney 1&2), United Kingdom
Industrial heavy-lift cargo drone with 100kg payload capacity. 8-rotor unmanned multicopter with push-pull motor configuration, powered by rechargeable batteries. Higher safety and greater performance with compact dimensions. Designed and manufactured in Europe (Bolzano, Italy). Proven operational performance across forestry, offshore wind turbine logistics, port operations, telecom tower construction, emergency medical delivery, and construction site supply.
FB3 by FlyingBasket · Operated by Ørsted · Unverified · Drones
UK's largest offshore drone delivery programme: 600+ flights delivering 38.1 tonnes of equipment to 400+ wind turbines at Hornsea 1, Hornsea 2, Walney 1, and Walney 2 offshore wind farms over 6.5 weeks (Aug-Sep 2025). Operated by Skylift for Ørsted. Up to 40 deliveries/day, ~10x more cost-effective than crane lifts.
Safety record
No incidents on record for FB3 at North Sea (Hornsea 1&2, Walney 1&2), United Kingdom.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Unverifiedhow tiers work →
- Last updated
- 2026-08-18
- Model
- FB3
- Company
- FlyingBasket
- Operator
- Ørsted
- Status
- operational
- First seen
- 2024-08-01
- ID
8e2a3083-ce67-48c5-82cf-e6baf6d362ba
Timeline
- Aug 2024First recordedFB3 first documented operating at North Sea (Hornsea 1&2, Walney 1&2), United Kingdom.
- Aug 2026Current status: operationalLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Operates worldwide
FB3 is deployed globally rather than at a single verified site, so there is no map pin.
FB3 operates in North Sea (Hornsea 1&2, Walney 1&2), United Kingdom. Explore the full verified map:
Sources (1)
- UK first as Ørsted uses giant drones to service world's largest offshore wind farms · https://orsted.co.uk/media/newsroom/news/2025/08/uk-first-as-orsted-uses-giant-drones-to-service-worlds-largest-offshore-wind-farms · 2024-08-01
Methodology: Unreviewed · 1 source (no primary) · last reviewed 2026-08-18
Verification posture
Unreviewed
Low confidence
Review state
Stable
Last reviewed 2026-08-18
Maturity + lifecycle
Maturity stage: commercial
Lifecycle: active
Architectural position
Cohort: aerial
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for FB3 at North Sea (Hornsea 1&2, Walney 1&2), United Kingdom.Common questions
What is the FB3 deployment at North Sea (Hornsea 1&2, Walney 1&2), United Kingdom?
Who operates FB3 at North Sea (Hornsea 1&2, Walney 1&2), United Kingdom?
When did the FB3 deployment at North Sea (Hornsea 1&2, Walney 1&2), United Kingdom go live?
Have there been incidents at the FB3 deployment at North Sea (Hornsea 1&2, Walney 1&2), United Kingdom?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/flyingbasket-fb3-north-sea-united-kingdom.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/8e2a3083-ce67-48c5-82cf-e6baf6d362ba
- Data documentation: /data
- Query this programmatically: Deploy MCP