DEPLOYDatabase

Deployment

Nuro R3 at Las Vegas, Nevada, USA

Nuro's third-generation electric autonomous delivery vehicle, unveiled in January 2022 at CES. The R3 was the first delivery AV equipped with an external front airbag for pedestrian and cyclist protection, and expanded payload capacity to 500 lbs across heated and cooled compartments. Nuro exited consumer fleet operations in September 2024, pivoting to licensing its autonomous driving stack (marketed as 'Nuro Driver') to automakers and mobility-as-a-service providers; the R3 vehicle program was effectively shelved at that time.

Nuro R3 by Nuro · Catalog entry · 1 source · not yet field-verified · Robotaxis

Recent coverage

See all coverage →


Nuro Robotaxi Engineering Vehicles testing on closed course in Las Vegas as part of robotaxi development. Nuro Driver tested in Las Vegas.

Safety record

No incidents on record for Nuro R3 at Las Vegas, Nevada, USA.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Trust tier
Catalog entry · 1 source · not yet field-verifiedhow tiers work →
Last updated
2026-08-14
Model
Nuro R3
Company
Nuro
Status
pilot
First seen
2025-08-01
ID
f0344696-689b-408b-86ae-8abf71a09162

Timeline

  1. Aug 2025
    First recorded
    Nuro R3 first documented operating at Las Vegas, Nevada, USA.
  2. Aug 2026
    Current status: pilot, reviewed
    Latest recorded state. New status transitions append here as the deployment-status recorder produces them.

On the deployment map

Operates worldwide

Nuro R3 is deployed globally rather than at a single verified site, so there is no map pin.

Free to use on your site, with a link back to DEPLOY.

Nuro R3 operates in Las Vegas, Nevada, USA. Explore the full verified map:

Sources (1)

  1. https://www.nuro.ai/blog/2025-a-year-of-momentum-and-milestones
Methodology: Verified · 1 source (no primary) · last reviewed 2026-08-14

Verification posture

Verified

Low confidence

Review state

Stable

Last reviewed 2026-08-14

Maturity + lifecycle

Maturity stage: pilot

Lifecycle: discontinued

Architectural position

Cohort: av

Sources by quality tier

1
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for Nuro R3 at Las Vegas, Nevada, USA.

Common questions

What is the Nuro R3 deployment at Las Vegas, Nevada, USA?
Nuro R3, built by Nuro, is recorded as a deployment at Las Vegas, Nevada, USA on the DEPLOY registry. Nuro operates the deployment directly.
Who operates Nuro R3 at Las Vegas, Nevada, USA?
Nuro, the manufacturer of Nuro R3, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
When did the Nuro R3 deployment at Las Vegas, Nevada, USA go live?
The deployment is recorded as starting August 1, 2025 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.
Have there been incidents at the Nuro R3 deployment at Las Vegas, Nevada, USA?
No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.

Deploy Watch

Track this deployment.

We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.

Machine-readable surfaces