Deployment
Robbins Main Beam TBM at Niagara Falls, Ontario, Canada
The Robbins Main Beam TBM is the company's signature hard rock tunnel boring machine, designed for competent rock conditions. Robbins pioneered the modern TBM design in 1952 and has continuously refined the Main Beam for projects ranging from 3m to over 13m diameter. These machines have set world records for tunnel excavation rates.
Robbins Main Beam TBM by The Robbins Company · Catalog entry · 1 source · not yet field-verified
Recent coverage
- Sir Adam Beck Hydroelectric Complex, Niagara Falls - Power TechnologyGoogle News · 2012-04-16
Robbins manufactured a 14.4m diameter TBM nicknamed 'Big Becky' for the Niagara Tunnel Project, boring a hydroelectric tunnel beneath Niagara Falls. The project was completed successfully.
Exposure
- Customer segment
- research
- Scale tier
- undisclosed
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
No incidents on record for Robbins Main Beam TBM at Niagara Falls, Ontario, Canada.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-21
- Company
- The Robbins Company
- Operator
- The Robbins Company
- Status
- ended
- Scale at site
- undisclosed
- Site environment
- outdoor
- Location precision
- verified coordinates
- First seen
- 2006-01-01
- ID
82307db6-020f-4c8d-9518-73f0a965f27d
Timeline
- Jan 2006First recordedRobbins Main Beam TBM first documented operating at Niagara Falls, Ontario, Canada.
- Aug 2026Current status: ended, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
Robbins Main Beam TBM operates in Niagara Falls, Ontario, Canada. Explore the full verified map:
Sources (1)
- Tunnel boring machine - Wikipedia · https://en.wikipedia.org/wiki/Tunnel_boring_machine · 2006-01-01
Methodology: Verified · 1 source (no primary) · last reviewed 2026-08-21
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-08-21
Maturity + lifecycle
Maturity stage: production
Lifecycle: active
Architectural position
Cohort: other
Sources by quality tier
- 1
- knowledge-base
- Knowledge base
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Robbins Main Beam TBM at Niagara Falls, Ontario, Canada.Common questions
What is the Robbins Main Beam TBM deployment at Niagara Falls, Ontario, Canada?
Who operates Robbins Main Beam TBM at Niagara Falls, Ontario, Canada?
When did the Robbins Main Beam TBM deployment at Niagara Falls, Ontario, Canada go live?
Is the Robbins Main Beam TBM deployment at Niagara Falls, Ontario, Canada still active?
Have there been incidents at the Robbins Main Beam TBM deployment at Niagara Falls, Ontario, Canada?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/robbins-main-beam-tbm-niagara-falls-ontario-canada.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/82307db6-020f-4c8d-9518-73f0a965f27d
- Data documentation: /data
- Query this programmatically: Deploy MCP