Deployment
SEALMINER A4 at Jigmeling, Bhutan
The SEALMINER A4 is Bitdeer's fourth-generation bitcoin mining rig powered by proprietary SEAL04 ASIC chips, achieving approximately 9.45 J/TH power efficiency. Mass production commenced in Q1 2026. The SEAL04 chip has demonstrated 6-7 J/TH at the chip level under low-voltage, ultra-power-saving mode. The rigs are deployed across Bitdeer's global data center network for self-mining operations.
SEALMINER A4 by Bitdeer Technologies · Catalog entry · 1 source · not yet field-verified
Recent coverage
- Bitdeer unveils new Bitcoin mining machine with 1 quadrillion calculations per second - Crypto BriefingGoogle News · 2026-07-08
- BTDR Deadline: BTDR Investors Have Opportunity to Lead Bitdeer Technologies Group Securities Fraud Lawsuit - Barchart.comGoogle News · 2026-02-01
- Bitdeer leases Nevada factory for U.S. ASIC miner manufacturing - blockspace.mediaGoogle News · 2025-12-22
500 MW Bitcoin mining data center construction completed, with energization proceeding in phases according to SEALMINER deliveries. One of Bitdeer's largest sites by capacity, leveraging Bhutan's hydroelectric power. Operated in partnership with the Kingdom of Bhutan.
Key facts
- Power capacity
- 500 MW
Exposure
- Customer segment
- research
- Scale tier
- commercial 10 99
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
No incidents on record for SEALMINER A4 at Jigmeling, Bhutan.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 1 source · not yet field-verifiedhow tiers work →
- Last updated
- 2026-08-21
- Model
- SEALMINER A4
- Company
- Bitdeer Technologies
- Location
- Jigmeling, Bhutan
- Operator
- Bitdeer Technologies
- Status
- operational
- Scale at site
- 11 to 100 units
- Site environment
- outdoor
- Location precision
- city centroid
- First seen
- 2024-06-01
- ID
ca289c7a-468e-4a0f-bd8f-4f82755d6e60
Timeline
- Jun 2024First recordedSEALMINER A4 first documented operating at Jigmeling, Bhutan.
- Aug 2026Current status: operational, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
SEALMINER A4 operates in Jigmeling, Bhutan. Explore the full verified map:
Sources (1)
- Bitdeer Announces October 2025 Production and Operations Update · https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-october-2025-production-and-operations-update · 2024-06-01
Methodology: Verified · 1 source (1 primary) · last reviewed 2026-08-21
Verification posture
Verified
High confidence
Review state
Stable
Last reviewed 2026-08-21
Maturity + lifecycle
Maturity stage: production
Lifecycle: active
Architectural position
Cohort: other
Sources by quality tier
- 1
- primary-company-ir
- Company IR disclosure
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for SEALMINER A4 at Jigmeling, Bhutan.Common questions
What is the SEALMINER A4 deployment at Jigmeling, Bhutan?
Who operates SEALMINER A4 at Jigmeling, Bhutan?
When did the SEALMINER A4 deployment at Jigmeling, Bhutan go live?
Have there been incidents at the SEALMINER A4 deployment at Jigmeling, Bhutan?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/sealminer-a4-jigmeling-bhutan.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/ca289c7a-468e-4a0f-bd8f-4f82755d6e60
- Data documentation: /data
- Query this programmatically: Deploy MCP