Deployment
SEALMINER A4 at Tydal, Norway
The SEALMINER A4 is Bitdeer's fourth-generation bitcoin mining rig powered by proprietary SEAL04 ASIC chips, achieving approximately 9.45 J/TH power efficiency. Mass production commenced in Q1 2026. The SEAL04 chip has demonstrated 6-7 J/TH at the chip level under low-voltage, ultra-power-saving mode. The rigs are deployed across Bitdeer's global data center network for self-mining operations.
SEALMINER A4 by Bitdeer Technologies · Unverified
225 MW hydro-cooling data center site completed and fully energized. SEALMINER A2/A3 rigs deployed for Bitcoin self-mining. Site is being converted to an AI data center with 121 critical IT MW leased to Volta Infra Holdings for NVIDIA GPU hosting under a 16-year agreement.
Key facts
- Power capacity
- 225 MW
Safety record
No incidents on record for SEALMINER A4 at Tydal, Norway.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Unverifiedhow tiers work →
- Last updated
- 2026-08-18
- Model
- SEALMINER A4
- Company
- Bitdeer Technologies
- Location
- Tydal, Norway
- Status
- operational
- First seen
- 2025-10-01
- ID
d85e8bf9-de13-4c04-91d0-0ca0b4976e7d
Timeline
- Oct 2025First recordedSEALMINER A4 first documented operating at Tydal, Norway.
- Aug 2026Current status: operationalLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
SEALMINER A4 operates in Tydal, Norway. Explore the full verified map:
Sources (1)
- Bitdeer Announces October 2025 Production and Operations Update · https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-october-2025-production-and-operations-update · 2025-10-01
Methodology: Unreviewed · 1 source (1 primary) · last reviewed 2026-08-18
Verification posture
Unreviewed
Low confidence
Review state
Stable
Last reviewed 2026-08-18
Maturity + lifecycle
Maturity stage: production
Lifecycle: active
Architectural position
Cohort: other
Sources by quality tier
- 1
- primary-company-ir
- Company IR disclosure
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for SEALMINER A4 at Tydal, Norway.Common questions
What is the SEALMINER A4 deployment at Tydal, Norway?
Who operates SEALMINER A4 at Tydal, Norway?
When did the SEALMINER A4 deployment at Tydal, Norway go live?
Have there been incidents at the SEALMINER A4 deployment at Tydal, Norway?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/sealminer-a4-tydal-norway.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/d85e8bf9-de13-4c04-91d0-0ca0b4976e7d
- Data documentation: /data
- Query this programmatically: Deploy MCP