Incident · Recall
da Vinci X/Xi recall: loose instrument carriage from an out-of-spec linear-rail component
Recall RA-73120 (Class II; ~Feb 23 2023): a loose instrument carriage on the Universal Surgical Manipulator caused by a linear-rail component out of specification (carriage wobble under force) on da Vinci X (IS4200) and Xi (IS4000); CAPA 552131. Cap-flag: sourced via Health Canada's regulator mirror; exact unit count not captured.
Occurred 2023-02-23 · da Vinci (and Ion) at South Korea · Intuitive Surgical · South Korea · Surgical robots · Investigated by FDA
How to read this record
Incident records on DEPLOY are compiled from public sources (regulatory filings, news reports, and operator disclosures) and reflect what has been reported and tracked to date. They are not legal findings, determinations of fault, or safety ratings, and may be updated as new information is verified. See the sources below for the underlying references.Machine-readable surfaces
- Markdown mirror: /incidents/davinci-instrument-carriage-recall-2023.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/incidents/4ed8c518-03f3-47dc-8ae4-fcdce4462922
- Data documentation: /data
- Query this programmatically: Deploy MCP
Outcomes (1)
- regulatory actionverified
Revision history (1)
- 2026-06-05 · outcome_class
Outcome rows carry verification_posture independently. Revision events carry basis (verified_court_filing, verified_insurance, reported_press, estimate, undisclosed). The framework records outcomes only when verifiable; absence is honest absence, not a claim of no-impact.
Sources (1)
Common questions
What happened in da Vinci X/Xi recall: loose instrument carriage from an out-of-spec linear-rail component?
When did this incident occur?
What robot was involved in da Vinci X/Xi recall: loose instrument carriage from an out-of-spec linear-rail component?
Has anyone responded to da Vinci X/Xi recall: loose instrument carriage from an out-of-spec linear-rail component?
What is the current status of da Vinci X/Xi recall: loose instrument carriage from an out-of-spec linear-rail component?
Methodology: Verified · 1 source (no primary) · last reviewed 2026-07-21
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-07-21
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for da Vinci X/Xi recall: loose instrument carriage from an out-of-spec linear-rail component.Deploy Watch
Track this incident.
We notify you when the regulator updates the record, the remedy status changes, or a related incident surfaces.
Canonical ID 4ed8c518-03f3-47dc-8ae4-fcdce4462922