DEPLOYDatabase

Robot model

Applied Digital Data Center

Applied Digital Corporation HPC and AI data center infrastructure for cloud computing.

Form factor
other
Maturity
commercial
Lifecycle
active

The verified answer

As of Oct 2026, DEPLOY verifies Applied Digital Data Center, a other by Applied Digital Corporation (commercial). 1 source back the record.

Deploy Watch

Track Applied Digital Data Center on Deploy.

We notify you when a verified state change lands on the record, not when the company issues a claim.

Key facts

Applied Digital page prints 175 MW live Critical IT

Applied Digital's home page prints Live Capacity of 175 MW Critical IT, with Under Contract 1.4 GW Critical IT and 2.0 GW Total Power. The stored empty-facts row is not this live-capacity cell (Applied Digital).

Applied Digital page prints about 3 GW and over 5 GW pipeline

The same page prints Active Pipeline Sites of about 3.0 GW Utility Power and Extended Pipeline of more than 5 GW Utility Power, with headquarters in Dallas and founding year 2021. Those pipeline cells are not the stored empty-facts row (Applied Digital).

Data & sources

Web sources

1

1 source backing this record.View all →

Pricing

No verified price is on record for Applied Digital Data Center. Physical-AI systems are often sold through enterprise contracts or operated as a service rather than at a public list price.

Recent activity

Every change to this record is dated, sourced, and independently verified where marked.

Full change history →

Safety record

No incidents on record for Applied Digital Data Center.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Sources (1)

  1. https://www.applieddigital.com/

Common questions

What is Applied Digital Data Center?
Applied Digital Corporation HPC and AI data center infrastructure for cloud computing.
How much does Applied Digital Data Center cost?
Applied Digital Data Center's price is not publicly disclosed. DEPLOY has no verified price on record for Applied Digital Data Center from Applied Digital Corporation. Physical-AI systems like this are often sold through enterprise contracts or operated as a service rather than at a public list price; check the manufacturer for the latest.
Is Applied Digital Data Center actually deployed in the real world?
Applied Digital Data Center is recorded at the commercial stage, but DEPLOY has no deployment verified at a named site yet; vendor deployment claims are not independently confirmed here. Manufacturer capability claims should be read as claims pending independent verification.
Who makes Applied Digital Data Center?
Applied Digital Data Center is made by Applied Digital Corporation, based in Dallas, Texas, USA, founded in 2021.
Can you buy Applied Digital Data Center?
Applied Digital Data Center is in commercial deployment and is sold to operators; contact the manufacturer to buy, and see the pricing section for any recorded price.
What are alternatives to Applied Digital Data Center?
On the DEPLOY registry, comparable other robots to Applied Digital Data Center include ASML EUV TwinScan, BrainOS, 10Beauty Manicure System, CleanSpark Bitcoin Mining Fleet.
How does Applied Digital Data Center compare to ASML EUV TwinScan?
Applied Digital Data Center and ASML EUV TwinScan (ASML Holding · 7 deployments) are both other robots on the DEPLOY registry. Applied Digital Data Center has 0 verified deployments on record. Compare both records for specs, safety, deployments, and verified-vs-claimed autonomy.
What is Applied Digital Data Center's maturity stage?
Applied Digital Data Center is at the commercial stage on the DEPLOY maturity ladder (research, prototype, pilot, commercial, production). Commercial stage means production-grade deployments are operating at named customer sites.
Where is Applied Digital Data Center deployed?
No verified deployments of Applied Digital Data Center are currently on the DEPLOY registry. DEPLOY records deployments only when verified at a named site with a primary source; absence may reflect pre-deployment, research, or manufacturer-internal use.
Is Applied Digital Data Center safe?
Applied Digital Data Center has no incidents on record in the DEPLOY registry. This does not constitute a safety guarantee; it reflects the incidents DEPLOY has tracked and verified to date.
Methodology: Verified · 1 source (no primary) · last reviewed 2026-10-04

Verification posture

Verified

Low confidence

Review state

Stable

Last reviewed 2026-10-04

Maturity + lifecycle

Maturity stage: commercial

Lifecycle: active

Architectural position

Cohort: other

Sources by quality tier

1
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for Applied Digital Data Center.