DEPLOYDatabase

Partnership

Katalyst Space x NASA (Swift Observatory Boost)

NASA awarded Katalyst Space Technologies a Phase III SBIR contract to develop and launch the LINK spacecraft to rendezvous with and boost the Neil Gehrels Swift Observatory to a higher orbit, extending its operational life. LINK launched July 3, 2026 but suffered an attitude control failure during commissioning.

deployment · Active · verified


Machine-readable surfaces

aac5030b-2a1e-4016-8490-caec795563ed

Parties (2)

Timeline

Announced
2025-09-01
Start
2026-07-03

Sources (1)

  1. https://www.katalystspace.com/news/katalyst-develops-design-for-nasa-to-rescue-500m-space-telescope

Deploy Watch

Track this partnership.

We notify you when the status changes against primary-source evidence, expansion is verified, or the partnership is terminated.