CtrlS Bihar 150 MW AI Data Centre

CtrlS Bihar 150 MW AI Data Centre is an AI data center campus developed by CtrlS in Bihar, India. 0.15 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · CtrlS · Bihar, India


Capacity: announced vs energized

Announced-to-energized gap: 0.15 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

CtrlS Bihar 150 MW AI Data Centre capacity claims
Source
Announced0.15 GW2026-11-20claimedpress release

Key facts

announced

Lifecycle

0.15 GW

Announced

0 GW

Energized

CtrlS

Developer

Bihar, India

Location

0.15 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on CtrlS Bihar 150 MW AI Data Centre. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a regional-level coordinate for this campus, not a verified site coordinate, so the marker shows the regional rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
CtrlS

Timeline

  1. Nov 2026
    capacity changed
    announced: unknown to 0.15
  2. Nov 2026
    Current: Announced

Sources

25fb4b19-d480-4fb9-adc6-5a5692bd30b4 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Common questions

What is CtrlS Bihar 150 MW AI Data Centre?
CtrlS Bihar 150 MW AI Data Centre is an AI data center campus tracked on the DEPLOY registry, located in Bihar, India. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will CtrlS Bihar 150 MW AI Data Centre use?
CtrlS Bihar 150 MW AI Data Centre has 0.15 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building CtrlS Bihar 150 MW AI Data Centre?
CtrlS is recorded as a party to CtrlS Bihar 150 MW AI Data Centre on the DEPLOY registry. The full party list, with each role, is on the record.
Is CtrlS Bihar 150 MW AI Data Centre operating yet?
As of the most recent verification on the DEPLOY registry, CtrlS Bihar 150 MW AI Data Centre is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on CtrlS Bihar 150 MW AI Data Centre?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track CtrlS Bihar 150 MW AI Data Centre on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). CtrlS Bihar 150 MW AI Data Centre: AI data center campus record. Retrieved November 26, 2026, from https://registry.deploy.report/datacenters/ctrls-bihar-150mw-ai-data-centre

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.