DEPLOYDatabase

Data center facility

NC-1 (WhiteFiber Madison AI Data Center Campus)

Bit Digital · Madison. Every figure below is individually sourced and dated.


Facility record

operating

Status

crypto hpc

Type

Bit Digital

Operator

Madison

Location

99 MW

Critical IT

970,000 sqft

Building

2025

Operational

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • building sqft: ~970,000 sq ft on 96 acres (former Unifi property) (reported) · source
  • critical it mw: 99 MW secured via Duke Energy capacity agreement; 24 MW initial phase; up to 200 MW potential (reported) · source
  • record: NC-1 (WhiteFiber Madison AI Data Center Campus) (reported) · source
  • status: Operational (targeted go-live December 2025; Tier 3 retrofit) (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is NC-1 (WhiteFiber Madison AI Data Center Campus)?
NC-1 (WhiteFiber Madison AI Data Center Campus) is a data center facility record on the DEPLOY registry, in Madison. Every fact on the record is individually sourced and dated.
Who operates NC-1 (WhiteFiber Madison AI Data Center Campus)?
Bit Digital operates NC-1 (WhiteFiber Madison AI Data Center Campus), per the sourced record on the DEPLOY registry.
Is NC-1 (WhiteFiber Madison AI Data Center Campus) operating?
NC-1 (WhiteFiber Madison AI Data Center Campus) is recorded as operating on the DEPLOY registry, with 99 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on NC-1 (WhiteFiber Madison AI Data Center Campus)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track NC-1 (WhiteFiber Madison AI Data Center Campus) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). NC-1 (WhiteFiber Madison AI Data Center Campus): data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/whitefiber-nc1-madison-north-carolina

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces