DEPLOYDatabase

Data center campus

DayOne Cyberjaya Campus

DayOne Cyberjaya Campus is a tracked AI data center campus in Cyberjaya.

Announced · GDS Holdings · Cyberjaya, Malaysia


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
DayOne Cyberjaya Campus capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

GDS Holdings

Developer

Malaysia

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
announced hyperscale campus in Cyberjaya cluster

On the data center map

No mappable coordinate is recorded for DayOne Cyberjaya Campus yet. Location: Cyberjaya.

The deal

developer
GDS Holdings

Power

Power source
grid
Interconnection

Why here

DayOne Cyberjaya Campus is in Cyberjaya. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

86f89632-c862-47e8-a3bf-9a7c13c8fdf9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is DayOne Cyberjaya Campus?
DayOne Cyberjaya Campus is an AI data center campus tracked on the DEPLOY registry, located in Cyberjaya. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building DayOne Cyberjaya Campus?
GDS Holdings is recorded as a party to DayOne Cyberjaya Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is DayOne Cyberjaya Campus operating yet?
As of the most recent verification on the DEPLOY registry, DayOne Cyberjaya Campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on DayOne Cyberjaya Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track DayOne Cyberjaya Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). DayOne Cyberjaya Campus: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/gds-holdings-dayone-cyberjaya-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces