DEPLOYDatabase

Data center campus

Equinix LG1 Lagos (MDX-i Lekki I)

Equinix LG1 Lagos is a tracked AI data center campus in Lagos. Original MDX-i flagship in Lekki Free Zone; Tier III certified; rebranded LG1 after Equinix acquisition (2022).

Energized · MainOne · Eko Electricity Distribution · Lagos


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Equinix LG1 Lagos (MDX-i Lekki I) capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

MainOne

Developer

Lagos

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
1.5 MW (~1.5 MW operational at Lekki I flagship carrier-neutral facility)
Grid operator
Eko Electricity Distribution

On the data center map

No mappable coordinate is recorded for Equinix LG1 Lagos (MDX-i Lekki I) yet. Location: Lagos.

The deal

developer
MainOne

Power

Power source
grid
Interconnection

Why here

Equinix LG1 Lagos is in Lagos. It connects to the Eko Electricity Distribution grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

c0ed958b-0e1d-440a-bca3-d9e6c4c727c2 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Equinix LG1 Lagos (MDX-i Lekki I)?
Equinix LG1 Lagos (MDX-i Lekki I) is an AI data center campus tracked on the DEPLOY registry, located in Lagos. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Equinix LG1 Lagos (MDX-i Lekki I)?
MainOne is recorded as a party to Equinix LG1 Lagos (MDX-i Lekki I) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Equinix LG1 Lagos (MDX-i Lekki I) operating yet?
As of the most recent verification on the DEPLOY registry, Equinix LG1 Lagos (MDX-i Lekki I) is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Equinix LG1 Lagos (MDX-i Lekki I)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Equinix LG1 Lagos (MDX-i Lekki I) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Equinix LG1 Lagos (MDX-i Lekki I): AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/mainone-equinix-lg1-lagos-mdx-i-lekki-i

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces