Equinix LG2 Lagos (MDX-i Lekki II)

Equinix LG2 Lagos is a tracked AI data center campus in Lagos. Second Lekki campus, opened 2020; expanded post-Equinix acquisition.

Energized · MainOne · Lagos


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Equinix LG2 Lagos (MDX-i Lekki II) capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

MainOne

Developer

Lagos

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
4.5 MW (reported ~4.5 MW at second Lekki facility; expansion phases announced)

On the data center map

No mappable coordinate is recorded for Equinix LG2 Lagos (MDX-i Lekki II) yet. Location: Lagos.

The deal

developer
MainOne

Power

Power source
grid
Interconnection

Why here

Equinix LG2 Lagos is in Lagos. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

8dff8b67-c155-4b87-a97a-bf8a6215ac09 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Equinix LG2 Lagos (MDX-i Lekki II)?
Equinix LG2 Lagos (MDX-i Lekki II) is an AI data center campus tracked on the DEPLOY registry, located in Lagos. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Equinix LG2 Lagos (MDX-i Lekki II)?
MainOne is recorded as a party to Equinix LG2 Lagos (MDX-i Lekki II) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Equinix LG2 Lagos (MDX-i Lekki II) operating yet?
As of the most recent verification on the DEPLOY registry, Equinix LG2 Lagos (MDX-i Lekki II) is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Equinix LG2 Lagos (MDX-i Lekki II)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Equinix LG2 Lagos (MDX-i Lekki II) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Equinix LG2 Lagos (MDX-i Lekki II): AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/mainone-equinix-lg2-lagos-mdx-i-lekki-ii

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces