Data center campus

Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park)

Moro Hub Green Data Center is a tracked AI data center campus in Dubai, Dubai. Moro Hub, a subsidiary of Digital DEWA (Dubai Electricity and Water Authority), operates a 100MW+ data center at the Mohammed bin Rashid Al Maktoum Solar Park, inaugurated February 2023 and recognized by Guinness World R

Energized · Moro Hub · other · Dubai, Dubai, United Arab Emirates


Capacity: announced vs energized

Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park) capacity claims
Source
Energized0.10 GW2023-02-01reportedjournalist report

Key facts

energized

Lifecycle

0.10 GW

Energized

Moro Hub

Developer

other

Grid

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Phase 1 inauguration Feb 2023 / Guinness solar DC (primary)
On Feb 16, 2023, Digital Dubai reported that Sheikh Hamdan bin Mohammed inaugurated Moro Hub's green data centre (Data Hub Integrated Solutions / Moro Hub, a Digital DEWA subsidiary) at the Mohammed bin Rashid Al Maktoum Solar Park, recognised by Guinness World Records as the world's largest solar-powered data centre. The release states 100% renewable energy, Uptime Tier III certification, capacity exceeding 100 MW, and area that will exceed 16,000 square metres (inauguration framing) (Digital Dubai, Feb 16 2023)
10-phase / 100 MW / 100,000 sqm plan (primary)
DEWA Media Office (Dec 3, 2024) and Moro Hub (Jan 22, 2025) state the carbon-neutral Green Data Centre is fully powered by solar energy and will be developed in 10 phases, achieving a total capacity of 100 megawatts and covering 100,000 square metres, with Uptime Tier III certification. Treat the 100 MW / 100,000 sqm figures as the operators' phased full-build plan; reconcile with the Feb 2023 'exceeding 100 MW' inauguration wording as company/government communications rather than inventing a live IT MW split (DEWA Media Office, Dec 3 2024; Moro Hub, Jan 22 2025)
Phase 2 inauguration Jan 22 2025 (primary)
On Jan 22, 2025, Moro Hub reported that Sheikh Maktoum bin Mohammed inaugurated the second phase of the Green Data Centre at the Mohammed Bin Rashid Al Maktoum Solar Park, with DEWA MD & CEO Saeed Mohammed Al Tayer hosting. The release restates Guinness recognition from phase 1 and positions phase 2 as expanding solar-powered digital services (cloud/hosting, cybersecurity, smart cities/IoT, professional and managed services) (Moro Hub, Jan 22 2025)
Digital DEWA / DEWA ownership framing (primary)
Official releases identify the operator as Data Hub Integrated Solutions (Moro Hub), a subsidiary of Digital DEWA, the digital arm of Dubai Electricity and Water Authority (DEWA), sited at the Mohammed bin Rashid Al Maktoum Solar Park (Digital Dubai, Feb 16 2023; Moro Hub, Jan 22 2025)

On the data center map

Every tracked data center is on this map, centered on Moro Hub Green Data Center. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Moro Hub · Subsidiary of Digital DEWA
operator
Moro Hub
utility
Dubai Electricity and Water Authority (DEWA) · Parent utility; supplies 100% solar power from MBR Solar Park
developer
Moro Hub

Power

Power source
solar storage
Grid operator
other
Interconnection

Mohammed bin Rashid Al Maktoum Solar Park, solar, Energized. DC drawn 100% from DEWA's ~3,000MW solar park

Why here

Moro Hub Green Data Center is in Dubai, Dubai. It connects to the other grid, draws on solar storage power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

UAE unmanned-aircraft (drone) framework (GCAA CAR-UAS)other · 2022-01-01 · United Arab Emirates

Timeline

  1. Aug 2026
    party added
    utility: Dubai Electricity and Water Authority (DEWA)
  2. Oct 2026
    Current: Energized

Sources

78b5d484-08c3-41ac-8149-852878b4d6da · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park)?
Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park) is an AI data center campus tracked on the DEPLOY registry, located in Dubai. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park)?
Moro Hub is recorded as a party to Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park) operating yet?
As of the most recent verification on the DEPLOY registry, Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park) is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park): AI data center campus record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/moro-hub-green-data-center-dubai

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces