DEPLOYDatabase

Data center campus

PDG NBP2 Nongsa Batam Data Centre

PDG NBP2 Nongsa Batam Data Centre is a tracked AI data center campus in Batam.

Under construction · Princeton Digital Group · PLN Batam · Batam


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
PDG NBP2 Nongsa Batam Data Centre capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
51 MW (second Nongsa building announced, campus scaling toward 96 MW total)
Grid operator
PLN Batam

On the data center map

No mappable coordinate is recorded for PDG NBP2 Nongsa Batam Data Centre yet. Location: Batam.

The deal

Power

Power source
grid
Grid operator
PLN Batam
Interconnection

Why here

PDG NBP2 Nongsa Batam Data Centre is in Batam. It connects to the PLN Batam grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

659934f6-1be7-4bd0-9695-95c1cc14a794 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is PDG NBP2 Nongsa Batam Data Centre?
PDG NBP2 Nongsa Batam Data Centre is an AI data center campus tracked on the DEPLOY registry, located in Batam. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building PDG NBP2 Nongsa Batam Data Centre?
Princeton Digital Group is recorded as a party to PDG NBP2 Nongsa Batam Data Centre on the DEPLOY registry. The full party list, with each role, is on the record.
Is PDG NBP2 Nongsa Batam Data Centre operating yet?
As of the most recent verification on the DEPLOY registry, PDG NBP2 Nongsa Batam Data Centre is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on PDG NBP2 Nongsa Batam Data Centre?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track PDG NBP2 Nongsa Batam Data Centre on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). PDG NBP2 Nongsa Batam Data Centre: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/princeton-digital-group-pdg-nbp2-nongsa-batam-data-centre

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces