DEPLOYDatabase

Data center campus

Switch Datacenters AMS2

Switch Datacenters AMS2 is a tracked AI data center campus in Woerden. Operational Netherlands colocation site.

Energized · Switch Datacenters · Woerden, Netherlands


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Switch Datacenters AMS2 capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Netherlands

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
operational; individual MW not publicly disclosed (portfolio pipeline >1,000 MW across Europe; target up to 100 MW per site)

On the data center map

No mappable coordinate is recorded for Switch Datacenters AMS2 yet. Location: Woerden.

The deal

Power

Power source
grid
Interconnection

Why here

Switch Datacenters AMS2 is in Woerden. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

b131c39e-2a02-4317-8f1d-5bbb2e9e467a · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Switch Datacenters AMS2?
Switch Datacenters AMS2 is an AI data center campus tracked on the DEPLOY registry, located in Woerden. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Switch Datacenters AMS2?
Switch Datacenters is recorded as a party to Switch Datacenters AMS2 on the DEPLOY registry. The full party list, with each role, is on the record.
Is Switch Datacenters AMS2 operating yet?
As of the most recent verification on the DEPLOY registry, Switch Datacenters AMS2 is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Switch Datacenters AMS2?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Switch Datacenters AMS2 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Switch Datacenters AMS2: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/switch-datacenters-ams2