DEPLOYDatabase

Data center campus

Switch Datacenters AMS6

Under construction · Switch Datacenters · Schiphol-Rijk, Netherlands


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Switch Datacenters AMS6 capacity claims
Source

Key facts

0 GW

Energized

Netherlands

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
under development; MW not publicly disclosed

On the data center map

No mappable coordinate is recorded for Switch Datacenters AMS6 yet. Location: Schiphol-Rijk.

The deal

Power

Power source
grid
Interconnection

Why here

Switch Datacenters AMS6 is in Schiphol-Rijk. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

7f41e8b0-9a6e-4554-a630-c893cdc7ecb4 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Switch Datacenters AMS6?
Switch Datacenters AMS6 is an AI data center campus tracked on the DEPLOY registry, located in Schiphol-Rijk. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Switch Datacenters AMS6?
Switch Datacenters is recorded as a party to Switch Datacenters AMS6 on the DEPLOY registry. The full party list, with each role, is on the record.
Is Switch Datacenters AMS6 operating yet?
As of the most recent verification on the DEPLOY registry, Switch Datacenters AMS6 is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Switch Datacenters AMS6?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Switch Datacenters AMS6 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Switch Datacenters AMS6: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/switch-datacenters-ams6

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces