Deployment
AEON at Ghent, Belgium
Industrial humanoid robot from Hexagon, developed with NVIDIA, Microsoft, and Swiss actuator maker maxon, built for factory work such as assembly lines and high-voltage EV battery manufacturing. Features 22 sensors and self-swapping batteries (about 23 seconds) for around-the-clock operation, with a walking speed near 2.5 m/s. In pilot deployment at BMW Group Plant Leipzig.
AEON by Hexagon · Operated by Volvo Cars · Catalog entry · 3 sources · not yet field-verified · Humanoids
Recent coverage
- Volvo Cars begins training Hexagon humanoid robots for factory workRobotics and Automation News · 2026-11-26
- AEON is making another leap in perception capabilities with NVIDIA HoloscanHexagon Robotics · 2026-10-21
- Schaeffler: Building the capabilities to deploy humanoid robotics at scaleHexagon Robotics · 2026-10-15
Volvo Cars is training Hexagon Robotics' AEON humanoids at its Ghent plant, the first Volvo Cars plant to try humanoid robots. Volvo says the training lays the groundwork for a factory pilot in the first half of 2027, when more AEON units will arrive in Ghent, and that the aim is to use the robots in real production from mid-2027.
Exposure
- Customer segment
- manufacturing
Each exposure value carries its own basis marker. Aggregators report a number; this surface preserves the source class so verification depth travels with the value.
Safety record
No incidents on record for AEON at Ghent, Belgium.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Catalog entry · 3 sources · not yet field-verifiedhow tiers work →
- Last updated
- 2026-11-28
- Model
- AEON
- Company
- Hexagon
- Location
- Ghent, Belgium
- Operator
- Volvo Cars
- Status
- pilot
- First seen
- 2026-11-26
- ID
d48c1760-740c-4736-8a81-b603fedd17f6
Timeline
- Nov 2026First recordedAEON first documented operating at Ghent, Belgium.
- Nov 2026Current status: pilot, reviewedLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
AEON operates in Ghent, Belgium. Explore the full verified map:
Sources (3)
- Volvo Cars trains Hexagon Robotics' humanoids for manufacturing · https://www.just-auto.com/news/volvo-cars-trains-hexagon-robotics-humanoids-for-manufacturing/ · 2026-11-26
- Volvo Car testing humanoid robots in Ghent · https://www.vrt.be/vrtnws/en/2026/11/26/volvo-car-testing-humanoid-robots-in-ghent/ · 2026-11-26
- Volvo Cars begins training Hexagon humanoid robots for factory work · https://roboticsandautomationnews.com/2026/11/26/volvo-cars-begins-training-hexagon-humanoid-robots-for-factory-work/107733/ · 2026-11-26
Methodology: Verified · 3 sources (no primary) · last reviewed 2026-11-28
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-11-28
Maturity + lifecycle
Maturity stage: pilot
Lifecycle: active
Architectural position
Cohort: humanoid
Sources by quality tier
- 3
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for AEON at Ghent, Belgium.Common questions
What is the AEON deployment at Ghent, Belgium?
Who operates AEON at Ghent, Belgium?
When did the AEON deployment at Ghent, Belgium go live?
Have there been incidents at the AEON deployment at Ghent, Belgium?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/aeon-volvo-cars-ghent.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/d48c1760-740c-4736-8a81-b603fedd17f6
- Data documentation: /data
- Query this programmatically: Deploy MCP