Deployment
ATOUN MODEL Y at Hong Kong
ATOUN's MODEL Y (Panasonic) is a powered-wear exoskeleton worn like a backpack that assists bending and lifting, providing up to ~10 kgf of support to the wearer's waist; it weighs about 4.5 kg with battery and runs ~4 hours per charge.
ATOUN MODEL Y by ATOUN · Unverified · Exoskeletons
Recent coverage
- Notice of Dissolution of ATOUN Inc - Exoskeleton ReportGoogle News · 2022-04-22
- Paralympics wins with Panasonic Robots - ABILITY MagazineGoogle News · 2021-10-26
- Powerful, Transformable Robotic Suit Was Built to Help You Carry Heavy Objects - autoevolutionGoogle News · 2021-09-28
Gammon Construction purchased 10 Assist Suit Exoskeleton units and signed an MOU with ATOUN and Shun Hing Systems for joint development of exoskeleton technology at Hong Kong construction sites. First construction-industry trial. Pilot ended when ATOUN dissolved in April 2022.
Key facts
- Fleet size
- 10 units
- Operator
- Gammon Construction Limited
- Use case
- Construction — reducing back strain for heavy lifting on sites
Safety record
No incidents on record for ATOUN MODEL Y at Hong Kong.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Unverifiedhow tiers work →
- Last updated
- 2026-08-06
- Model
- ATOUN MODEL Y
- Company
- ATOUN
- Status
- pilot
- First seen
- 2017-11-28
- ID
4dea2eb5-5dd6-4f4e-beb3-315f52083132
Timeline
- Nov 2017First recordedATOUN MODEL Y first documented operating at Hong Kong.
- Aug 2026Current status: pilotLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
ATOUN MODEL Y operates in Hong Kong. Explore the full verified map:
Sources (1)
- Panasonic Power Assist Suit Enters Joint Development of Construction Technology in Hong Kong · https://news.panasonic.com/global/topics/5162 · 2017-11-28
Methodology: Unreviewed · 1 source (no primary) · last reviewed 2026-08-06
Verification posture
Unreviewed
Low confidence
Review state
Stable
Last reviewed 2026-08-06
Maturity + lifecycle
Maturity stage: research
Lifecycle: active
Architectural position
Cohort: exoskeleton
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for ATOUN MODEL Y at Hong Kong.Common questions
What is the ATOUN MODEL Y deployment at Hong Kong?
Who operates ATOUN MODEL Y at Hong Kong?
When did the ATOUN MODEL Y deployment at Hong Kong go live?
Have there been incidents at the ATOUN MODEL Y deployment at Hong Kong?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.
Machine-readable surfaces
- Markdown mirror: /deployments/atoun-model-y-hong-kong.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/4dea2eb5-5dd6-4f4e-beb3-315f52083132
- Data documentation: /data
- Query this programmatically: Deploy MCP