Deployment
Chuck at Milton Keynes
Collaborative AMR for warehouse fulfillment. Follows workers to locations and carries inventory.
Chuck by 6 River Systems · Operated by GXO Logistics · Catalog entry · 3 sources · not yet field-verified
Machine-readable surfaces
- Markdown mirror: /deployments/chuck-amr-gxo-milton-keynes.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/4017a082-29d5-4b8e-b262-17fd123827c7
- Data documentation: /data
- Query this programmatically: Deploy MCP
GXO Logistics deployed 6 River Systems Chuck collaborative mobile robots across multiple mezzanine floors at its distribution center in Milton Keynes, UK. Announced December 14, 2021, this was described as an industry first for multi-tiered AMR operation. Chuck robots navigate between levels of a mezzanine structure to assist warehouse pickers. Part of GXO's broader multi-year global expansion of 6RS collaborative robots across its US and European logistics network.
Key facts
- Deployment type
- Multi-tiered mezzanine (industry first)
- Announced
- December 14, 2021
- Trust tier
- Catalog entry · 3 sources · not yet field-verified
- Last updated
- 2026-06-12
- Model
- Chuck
- Company
- 6 River Systems
- Location
- Milton Keynes
- Operator
- GXO Logistics
- Status
- operational
- First seen
- 2021-12-14
- ID
4017a082-29d5-4b8e-b262-17fd123827c7
Sources (3)
- https://www.globenewswire.com/news-release/2021/12/14/2351300/0/en/GXO-Achieves-Industry-First-with-Multi-Tiered-Collaborative-Mobile-Robot.html · 2021-12-14
- https://gxo.com/news_article/gxo-achieves-industry-first-with-multi-tiered-cobots/ · 2021-12-14
- https://www.therobotreport.com/gxo-to-implement-6-river-systems-chuck-globally/
Methodology: Verified · 3 sources (no primary) · last reviewed 2026-06-12
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-06-12
Maturity + lifecycle
Lifecycle: active
Architectural position
Cohort: amr
Sources by quality tier
- 2
- unclassified
- Unclassified source
- 1
- secondary-trade-publication
- Trade publication
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Chuck at Milton Keynes.Common questions
- What is the Chuck deployment at Milton Keynes?
- Chuck, built by 6 River Systems, is recorded as a deployment at Milton Keynes on the DEPLOY registry. GXO Logistics operates the deployment.
- Who operates Chuck at Milton Keynes?
- GXO Logistics operates this deployment as a customer of 6 River Systems, the manufacturer of Chuck.
- When did the Chuck deployment at Milton Keynes go live?
- The deployment is recorded as starting December 14, 2021 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.
- Have there been incidents at the Chuck deployment at Milton Keynes?
- No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.