Deployment
MOS at Suzhou, Jiangsu, China
The MOS (Mobilized Operating System) is a heavy-duty wheeled arm robot developed by LUMOS Robotics, featuring a 50 kg payload dual-arm system. It is deployed in joint labs with Mitsubishi Electric for AI visual inspection on PLC production lines.
MOS by Lumos Robotics · Operated by Mitsubishi Electric Corporation · Unverified
Recent coverage
- Mercedes’ new GLA EV leaks a day ahead of its official debutElectrek · 2026-07-28
- Saudi Prince Alwaleed takes 5% Lucid (LCID) stake, stock jumps 25%Electrek · 2026-07-28
- Kia’s next electric van is hard to miss on the road [Video]Electrek · 2026-07-27
Machine-readable surfaces
- Markdown mirror: /deployments/lumos-mos-suzhou-jiangsu-china.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/robots/4d42a3f3-9646-423f-804e-47fd5f0ca4d2
- Data documentation: /data
- Query this programmatically: Deploy MCP
Joint lab with Mitsubishi Electric in Suzhou, deploying LUMOS MOS system for AI visual inspection on PLC production lines.
Key facts
- Deployment type
- Joint lab with Mitsubishi Electric
- Application
- AI visual inspection on PLC production lines
Safety record
No incidents on record for MOS at Suzhou, Jiangsu, China.
Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.
- Trust tier
- Unverifiedhow tiers work →
- Last updated
- 2026-08-01
- Model
- MOS
- Company
- Lumos Robotics
- Operator
- Mitsubishi Electric Corporation
- Status
- operational
- First seen
- 2026-05-11
- ID
4d42a3f3-9646-423f-804e-47fd5f0ca4d2
Timeline
- May 2026First recordedMOS first documented operating at Suzhou, Jiangsu, China.
- Aug 2026Current status: operationalLatest recorded state. New status transitions append here as the deployment-status recorder produces them.
On the deployment map
MOS operates in Suzhou, Jiangsu, China. Explore the full verified map:
Sources (1)
- Lumos Robotics Closes ~1B RMB Across A1 and A2 Rounds, Mitsubishi Electric Leads · https://pandaily.com/lumos-robotics-closes-1b-rmb-across-a1-and-a2-rounds-mitsubishi-electric-leads/ · 2026-05-11
Methodology: Unreviewed · 1 source (no primary) · last reviewed 2026-08-01
Verification posture
Unreviewed
Low confidence
Review state
Stable
Last reviewed 2026-08-01
Maturity + lifecycle
Maturity stage: pilot
Lifecycle: active
Architectural position
Cohort: other
Sources by quality tier
- 1
- unclassified
- Unclassified source
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for MOS at Suzhou, Jiangsu, China.Common questions
What is the MOS deployment at Suzhou, Jiangsu, China?
Who operates MOS at Suzhou, Jiangsu, China?
When did the MOS deployment at Suzhou, Jiangsu, China go live?
Have there been incidents at the MOS deployment at Suzhou, Jiangsu, China?
Deploy Watch
Track this deployment.
We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.