DEPLOYDatabase

Deployment

4NE-1 at LabCampus, Munich Airport, Germany

Cognitive humanoid robot from NEURA Robotics, designed for industrial and service applications. It is a humanoid robot designed for physical AI applications. Key specifications include Height: 180 cm, Payload: 100 kg, AI system: NVIDIA Isaac GR00T, Drive type: bipedal, Production target: late 2026.

4NE-1 by NEURA Robotics · Catalog entry · 3 sources · not yet field-verified · Humanoids

Recent coverage

See all coverage →


TUM and NEURA Robotics opened the TUM RoboGym at LabCampus, the innovation hub at Munich Airport, in October 2026. It is described as developed by TUM MIRMI and NEURA Robotics and as the first site in the global NEURA Gym network. Reports say around 100 humanoid and service robots will train in 48 dedicated training cells.

NEURA says it is unveiling the next generation of its 4NE1 humanoid, which it says will also become part of the TUM RoboGym environment. NEURA's CEO David Reger says the robot is designed for series production (Logistik Heute). The sources do not state that a 4NE1 is already working in the RoboGym, so this is recorded as announced. This record covers the next-generation 4NE1; the model record may describe an earlier generation.

Safety record

No incidents on record for 4NE-1 at LabCampus, Munich Airport, Germany.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Trust tier
Catalog entry · 3 sources · not yet field-verifiedhow tiers work →
Last updated
2026-10-29
Model
4NE-1
Status
announced
First seen
2026-10-22
ID
bef2168d-e389-4dfb-878b-9cd55af625ed

Timeline

  1. Oct 2026
    First recorded
    4NE-1 first documented operating at LabCampus, Munich Airport, Germany.
  2. Oct 2026
    Current status: announced, reviewed
    Latest recorded state. New status transitions append here as the deployment-status recorder produces them.

On the deployment map

Operates worldwide

4NE-1 is deployed globally rather than at a single verified site, so there is no map pin.

Free to use on your site, with a link back to DEPLOY.

4NE-1 operates in LabCampus, Munich Airport, Germany. Explore the full verified map:

Sources (3)

  1. TUM opens new innovation hub at LabCampus (Munich Airport press) · https://www.munich-airport.com/press-tum-opens-new-innovation-hub-at-labcampus-44273939
  2. TU Munich and Neura open training center RoboGym (Logistik Heute) · https://logistik-heute.de/en/news/artificial-intelligence-tu-munich-and-neura-open-training-center-robogym-289925.html
  3. TUM Convergence Center and TUM RoboGym powered by NEURA (release reprint) · https://www.suasnews.com/2026/10/tum-convergence-center-and-tum-robogym-powered-by-neura-unite-research-talent-and-industry-to-accelerate-the-development-of-ai-and-robotics/
Methodology: Verified · 3 sources (no primary) · last reviewed 2026-10-29

Verification posture

Verified

Low confidence

Review state

Stable

Last reviewed 2026-10-29

Maturity + lifecycle

Maturity stage: pilot

Lifecycle: active

Architectural position

Cohort: humanoid

Sources by quality tier

3
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for 4NE-1 at LabCampus, Munich Airport, Germany.

Common questions

What is the 4NE-1 deployment at LabCampus, Munich Airport, Germany?
4NE-1, built by NEURA Robotics, is recorded as a deployment at LabCampus, Munich Airport, Germany on the DEPLOY registry. NEURA Robotics operates the deployment directly.
Who operates 4NE-1 at LabCampus, Munich Airport, Germany?
NEURA Robotics, the manufacturer of 4NE-1, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
When did the 4NE-1 deployment at LabCampus, Munich Airport, Germany go live?
The deployment is recorded as starting October 22, 2026 on the DEPLOY registry. Earlier activity may exist but is not yet sourced.
Is the 4NE-1 deployment at LabCampus, Munich Airport, Germany still active?
As of the most recent verification on the DEPLOY registry, this deployment is announced but not yet operating.
Have there been incidents at the 4NE-1 deployment at LabCampus, Munich Airport, Germany?
No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.

Deploy Watch

Track this deployment.

We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.

Machine-readable surfaces