Incident · Other
Fukushima Daiichi nuclear disaster: three reactor meltdowns trigger 40-year robotic decommissioning program
On March 11, 2011, a magnitude 9.0 earthquake and 15-meter tsunami struck the Fukushima Daiichi Nuclear Power Station, destroying diesel generators that powered coolant pumps. Three reactors suffered full meltdowns and hydrogen explosions, releasing radioactive contamination. Three TEPCO employees were killed by the tsunami. The disaster initiated a decades-long decommissioning program relying on robotic systems for fuel debris retrieval, radiation surveying, and site inspection.
Occurred 2011-03-11 · TEPCO
How to read this record
Incident records on DEPLOY are compiled from public sources (regulatory filings, news reports, and operator disclosures) and reflect what has been reported and tracked to date. They are not legal findings, determinations of fault, or safety ratings, and may be updated as new information is verified. See the sources below for the underlying references.Machine-readable surfaces
- Markdown mirror: /incidents/tepco-fukushima-daiichi-nuclear-disaster-2011.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/incidents/1984868c-32cd-4a72-b4e0-0db6b5c4b4bd
- Data documentation: /data
- Query this programmatically: Deploy MCP
Sources (3)
- World Nuclear Association · https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident · 2024-01-01
- Wikipedia · https://en.wikipedia.org/wiki/Fukushima_nuclear_accident · 2024-01-01
- IAEA · https://www.iaea.org/topics/response/fukushima-daiichi-nuclear-accident · 2024-01-01
Common questions
What happened in Fukushima Daiichi nuclear disaster: three reactor meltdowns trigger 40-year robotic decommissioning program?
When did this incident occur?
Who was involved in Fukushima Daiichi nuclear disaster: three reactor meltdowns trigger 40-year robotic decommissioning program?
Has anyone responded to Fukushima Daiichi nuclear disaster: three reactor meltdowns trigger 40-year robotic decommissioning program?
What is the current status of Fukushima Daiichi nuclear disaster: three reactor meltdowns trigger 40-year robotic decommissioning program?
Methodology: Unreviewed · 3 sources (no primary) · last reviewed 2026-08-31
Verification posture
Unreviewed
Low confidence
Review state
Stable
Last reviewed 2026-08-31
Sources by quality tier
- 2
- unclassified
- Unclassified source
- 1
- knowledge-base
- Knowledge base
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Fukushima Daiichi nuclear disaster: three reactor meltdowns trigger 40-year robotic decommissioning program.Deploy Watch
Track this incident.
We notify you when the regulator updates the record, the remedy status changes, or a related incident surfaces.
Canonical ID 1984868c-32cd-4a72-b4e0-0db6b5c4b4bd