Incident · Other
Fukushima Daiichi nuclear disaster: three reactor cores melt, starting a 30 to 40 year decommissioning
On March 11, 2011, a magnitude 9.0 earthquake and a tsunami about 15 meters high struck the Fukushima Daiichi Nuclear Power Station, flooding the diesel generators and damaging the seawater cooling pumps. The cores of three reactors largely melted in the first three days, hydrogen explosions damaged the plant buildings, and radioactive material was released.
Three TEPCO employees at the Daiichi and Daini plants were killed directly by the earthquake and tsunami. Decommissioning is expected to take 30 to 40 years, with large-scale fuel debris retrieval using robotic arms targeted for the first half of the 2030s.
Occurred 2011-03-11 · TEPCO
How to read this record
Incident records on DEPLOY are compiled from public sources (regulatory filings, news reports, and operator disclosures) and reflect what has been reported and tracked to date. They are not legal findings, determinations of fault, or safety ratings, and may be updated as new information is verified. See the sources below for the underlying references.Machine-readable surfaces
- Markdown mirror: /incidents/tepco-fukushima-daiichi-nuclear-disaster-2011.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/incidents/1984868c-32cd-4a72-b4e0-0db6b5c4b4bd
- Data documentation: /data
- Query this programmatically: Deploy MCP
Sources (3)
- World Nuclear Association · https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident · 2024-01-01
- Wikipedia · https://en.wikipedia.org/wiki/Fukushima_nuclear_accident · 2024-01-01
- IAEA · https://www.iaea.org/topics/response/fukushima-daiichi-nuclear-accident · 2024-01-01
Common questions
What happened in Fukushima Daiichi nuclear disaster: three reactor cores melt, starting a 30 to 40 year decommissioning?
When did this incident occur?
Who was involved in Fukushima Daiichi nuclear disaster: three reactor cores melt, starting a 30 to 40 year decommissioning?
Has anyone responded to Fukushima Daiichi nuclear disaster: three reactor cores melt, starting a 30 to 40 year decommissioning?
What is the current status of Fukushima Daiichi nuclear disaster: three reactor cores melt, starting a 30 to 40 year decommissioning?
Methodology: Verified · 3 sources (no primary) · last reviewed 2026-11-01
Verification posture
Verified
Low confidence
Review state
Stable
Last reviewed 2026-11-01
Sources by quality tier
- 2
- unclassified
- Unclassified source
- 1
- knowledge-base
- Knowledge base
The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.
Methodology surface for Fukushima Daiichi nuclear disaster: three reactor cores melt, starting a 30 to 40 year decommissioning.Deploy Watch
Track this incident.
We notify you when the regulator updates the record, the remedy status changes, or a related incident surfaces.
Canonical ID 1984868c-32cd-4a72-b4e0-0db6b5c4b4bd