DEPLOYDatabase

Data center campus

AdaniConneX Noida 1

AdaniConneX Noida 1 is a tracked AI data center campus in Noida, Uttar Pradesh, India. One of six AdaniConneX Indian campuses named on the operator's site.

Under construction · AdaniConnex · Noida, Uttar Pradesh, India


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
AdaniConneX Noida 1 capacity claims
Source

Key facts

On the data center map

Every tracked data center is on this map, centered on AdaniConneX Noida 1. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
AdaniConnex

Power

Power source
mixed
Interconnection

Why here

AdaniConneX Noida 1 is in Noida, Uttar Pradesh, India. It draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

55bd3a52-a712-4d91-8240-311ab76c8d72 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is AdaniConneX Noida 1?
AdaniConneX Noida 1 is an AI data center campus tracked on the DEPLOY registry, located in Noida, Uttar Pradesh, India. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building AdaniConneX Noida 1?
AdaniConnex is recorded as a party to AdaniConneX Noida 1 on the DEPLOY registry. The full party list, with each role, is on the record.
Is AdaniConneX Noida 1 operating yet?
As of the most recent verification on the DEPLOY registry, AdaniConneX Noida 1 is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on AdaniConneX Noida 1?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track AdaniConneX Noida 1 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). AdaniConneX Noida 1: AI data center campus record. Retrieved September 10, 2026, from https://registry.deploy.report/datacenters/adani-connex-adaniconnex-noida-1

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces